September 23rd 2021 » History » Version 3
Alexandre Camsonne, 09/23/2021 03:28 PM
1 | 1 | Alexandre Camsonne | h1. September 23rd 2021 |
---|---|---|---|
2 | |||
3 | *Updates |
||
4 | 2 | Alexandre Camsonne | ** VMM |
5 | 3 | Alexandre Camsonne | ***power board being assembled |
6 | ***FPGA boarded reviewed and some correction done |
||
7 | ***Acquired supply for testing |
||
8 | ***Ben has software to readout the 12 channel board : need to get together with Xinzhan, Ben and Ed to setup software |
||
9 | ***Xinzhan setting up GEM in test lab - make sure prototype works |
||
10 | *** |
||
11 | 2 | Alexandre Camsonne | ** FADC trigger UMass |
12 | 3 | Alexandre Camsonne | ***Test lab 2 VXS crates with 1 VTP each and 1 FADC connected by fiber |
13 | ***Ben got started on clustering with two crates |
||
14 | ***still need to get started |
||
15 | |||
16 | * |