From 08/04/2025 to 09/02/2025

08/31/2025

12:46 AM Bug #1130 (Resolved): Water Leakage
One of the boxes was broken.
Water leaked at the space between the hose and tape covering the cylinder on the roof o...
Kaito Higashimoto

08/25/2025

12:54 AM Bug #1128 (New): Failure measurement
At First, I decided to take OPE data via FAN I/O modules, but I found that the baseline transition is quite large com... Kaito Higashimoto
12:51 AM Task #1127 (New): Small NPE
NPE created by cosmic rays in WC is smaller than that gotten in Tokyo.
One of the solutions is :
・exchange water
・...
Kaito Higashimoto
12:50 AM Idea #1126 (New): Macros for WC
higashi developed macro for WC NPE analysis and comparison of the ways to calculate NPE.
The one way is to integrate...
Kaito Higashimoto

08/21/2025

10:17 AM Bug #1125 (New): failure for setting OPE trigger
Kaito & Ken tried to take data of WC with cosmic ray.
Cosmic data was obtained. however, we failed to setting One Ph...
Kaito Higashimoto

08/20/2025

09:53 AM Idea #1124 (New): Optical Grease
Forgot to bring optical grease to JLab but Nishida found the one Akiyama might use in 2019 to measure the NPE of WC i... Kaito Higashimoto
09:46 AM Task #1093: WC test by cosmic in JLab
Kaito Higashimoto wrote:
> brbrbr
Kaito Higashimoto
09:43 AM Task #1093: WC test by cosmic in JLab
8/8 Sent the new WC boxes and other equipment to JLab.
8/14 Kaito arrived at JLab & received the baggages.
8/19 Prep...
Kaito Higashimoto
 