General

Profile

Ken Nishida

  • Login: knishida
  • Registered on: 02/24/2025
  • Last connection: 01/27/2026

Issues

open closed Total
Assigned issues 6 0 6
Reported issues 2 0 2

Projects

Project Roles Registered on
Hypernuclear Developer, Reporter 05/02/2025
Enge SciFi Developer, Reporter 05/22/2025
Enge SiPM test Manager, Developer, Reporter 02/24/2025
HES DC Manager, Developer, Reporter 06/19/2025
HES Hodo Manager, Developer, Reporter 07/03/2025
HKS DAQ Manager, Developer, Reporter 05/02/2025
HKS DC Developer, Reporter 06/19/2025
HKS Hodo Manager, Developer, Reporter 07/03/2025
HKS WC Developer, Reporter 05/22/2025
HYP Software Developer, Reporter 05/21/2025
Hypernuclear ERR Developer, Reporter 05/02/2025
MRPC for hypernucler Developer, Reporter 05/02/2025

Activity

01/27/2026

04:19 PM Hypernuclear Task #1155 (New): Hodoscope commissioning with cosmic ray in ESB
Commissioning of hodocsopes, HKS, HES, and ENGE, is onging in ESB.
HES Hodoscope: https://docs.google.com/document/...
Ken Nishida
11:16 AM Hypernuclear Task #1154 (New): Drift chamber commissioning with cosmic ray ESB
Commissioning of drift chambers, EDC and KDC, is onging in ESB.
EDC ELOG: https://docs.google.com/document/d/1SCD2p...
Ken Nishida

07/29/2025

04:56 PM HKS Hodo Task #1121: Hodoscope Spare
I found 9 WC boxes, two H1949 PMTs, 27 H7195 PMTs and lots of spares of TEPRA tape (6,9,24mm), though one of the two ... Ken Nishida

07/07/2025

10:23 PM HES Hodo Task #1120: Hodoscope Spare
I found the last one scintillator paddle of HES hodoscope in ESB, but the connecting part between paddle and light gu... Ken Nishida

04/15/2025

05:17 PM Enge SiPM test Wiki edit: Wiki (#21)
Ken Nishida

04/14/2025

05:22 AM Enge SiPM test Wiki edit: Wiki (#20)
Ken Nishida

03/25/2025

02:23 PM Enge SiPM test Wiki edit: Wiki (#15)
Ken Nishida
01:57 PM Enge SiPM test Wiki edit: Wiki (#14)
Ken Nishida
01:39 PM Enge SiPM test Wiki edit: Wiki (#13)
Ken Nishida
12:30 PM Enge SiPM test Wiki edit: Wiki (#12)
Ken Nishida