Jin Takahashi
- Login: jtaka
- Registered on: 07/29/2025
- Last connection: 08/16/2025
Issues
open | closed | Total | |
---|---|---|---|
Assigned issues | 1 | 0 | 1 |
Reported issues | 0 | 0 | 0 |
Projects
Project | Roles | Registered on |
---|---|---|
Hypernuclear | Developer, Reporter | 07/30/2025 |
Enge SciFi | Developer, Reporter | 07/30/2025 |
HES DC | Manager, Developer, Reporter | 08/26/2025 |
HKS DAQ | Developer, Reporter | 07/30/2025 |
HKS WC | Developer, Reporter | 07/30/2025 |
HYP Software | Developer, Reporter | 07/30/2025 |
Hypernuclear ERR | Developer, Reporter | 07/30/2025 |
MRPC for hypernucler | Developer, Reporter | 07/30/2025 |
Activity
09/03/2025
- 11:57 AM HES DC 1.50 hour (Task #1129 (Feedback): Wire Repair)
- 11:57 AM HES DC Task #1129: Wire Repair
- *Low Voltage Test*
2025/09/03
From the CAEN Mod SY403 (ch2), apply V_set; +100 V+ , I_set 1 uA (->current limit) to...
09/02/2025
- 03:56 PM HES DC 2.00 hours (Task #1129 (Feedback): Wire Repair)
- 03:56 PM HES DC Task #1129: Wire Repair
- *Low Voltage Test*
2025/09/02
From the CAEN Mod SY403 (ch2), apply V_set; 1V, I_set 1 uA (->current limit) to field w...
08/29/2025
- 05:36 PM HES DC Task #1129 (Feedback): Wire Repair
- +*Status*+
2025/8/29
+*All the wires*+ are repaired (6 field wires, 5 anode wires)
|_. Layer|_. col|_.row|_.wire|... - 05:36 PM HES DC 8.50 hours (Task #1129 (Feedback): Wire Repair)
- Repair Status Summary during 2025/08/28, 29
- 05:16 PM HES DC 6.00 hours (Task #1129 (Feedback): Wire Repair)
- Repair Status Summary during 2025/08/26, 27
- 05:16 PM HES DC Task #1129: Wire Repair
- +*Status*+
2025/8/27
*Wire*
All the Field wires are repaired
|_. Layer|_. col|_.row|_.wire|_.status|
|2nd|7|30|Field...
08/26/2025
- 12:44 PM HES DC 240.00 hours (Task #1129 (Feedback): Wire Repair)
- Repair Status Summary during 2025/08/15~2025/08/25
- 12:44 PM HES DC Task #1129 (In Progress): Wire Repair
- +*Status*+
*Wire*
|_. Layer|_. col|_.row|_.wire|_.status|
|2nd|7|30|Field|Repaired|
|2nd|5|35|Field|Pulled out the ...