Actions
Task #1107
openTask #1105: NPE study for beta rays
MPPC Gain Study
Start date:
06/06/2025
Due date:
06/13/2025 (about 5 months late)
% Done:
100%
Estimated time:
Files
Actions
Task #1105: NPE study for beta rays
Added by Kotaro Nishi 5 months ago. Updated 4 months ago.
100%
Files
| スクリーンショット 2025-05-16 7.13.11.png (78.5 KB) スクリーンショット 2025-05-16 7.13.11.png | Kotaro Nishi, 06/06/2025 01:34 AM | ||
| 99428_0.jpg (196 KB) 99428_0.jpg | Kotaro Nishi, 06/09/2025 03:21 AM | ||
| 99429_0.jpg (133 KB) 99429_0.jpg | Kotaro Nishi, 06/09/2025 03:21 AM | ||
| 100926_0.jpg (151 KB) 100926_0.jpg | Kotaro Nishi, 06/24/2025 07:19 AM | ||
| 100924_0.jpg (149 KB) 100924_0.jpg | Kotaro Nishi, 06/24/2025 07:19 AM |
jumper pin connection
Noise reduction
EASIROC upper side flame is critical to noise reduction. Aftre fixing, noise level is about 40 mV