Project

General

Profile

Actions

Task #1152

open

US/DS scanner motion control

Added by Sanghwa Park 8 days ago. Updated 8 days ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Slow Controls
Start date:
01/15/2026
Due date:
% Done:

0%

Estimated time:
Responsible:

Description

Upstream and Downstream scanner motion control system.
The hardware already exists, and the motion is controlled by a python script. Andrew Gunsch will work on integrating it into CS Studio.

Actions

Also available in: Atom PDF