Project

General

Profile

Actions

Feature #45

open

Feature #41: Integrate VDC multihit analysis from APEX branch

Consider t0 in matching clusters between lower and upper VDC chambers

Added by Ole Hansen over 7 years ago. Updated over 7 years ago.

Status:
New
Priority:
Normal
Assignee:
Target version:
Start date:
Due date:
% Done:

0%

Estimated time:
16.00 h
Responsible:

Description

If using a 3-parameter cluster fit, the resulting time offset, t0, of each cluster needs to be used in the matching algorithm between the lower and the upper chambers.

Actions #1

Updated by Ole Hansen over 7 years ago

  • Start date deleted (05/17/2017)
Actions

Also available in: Atom PDF