Actions
Feature #45
openFeature #41: Integrate VDC multihit analysis from APEX branch
Consider t0 in matching clusters between lower and upper VDC chambers
Start date:
Due date:
% Done:
0%
Estimated time:
16.00 h
Responsible:
Description
If using a 3-parameter cluster fit, the resulting time offset, t0, of each cluster needs to be used in the matching algorithm between the lower and the upper chambers.
Actions