2019 Run Plans and Run Sheets » History » Revision 33
Revision 32 (Mireille Muhoza, 07/20/2019 08:26 AM) → Revision 33/37 (Mireille Muhoza, 07/29/2019 06:23 PM)
h1. Run Plans and Run Sheets h2. Summer 2019 Run Period * Blank Run Sheets ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf * Run Plans ** Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods ** Run Plan attachment:runplan_lowQ2.pdf ** SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf ** Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf * Run List ** Runlist CSV file attachment: attachment:pion_runlist_summer19.csv ** Standard kinematics attachment:standard.kinematics * Run Sheets ** 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) attachment:optics_2p7gev.pdf ** 2.7 GeV Run Sheets attachment:runsheets_2p7gev.pdf ** 3.6 GeV Run Sheets attachment:runsheets_3p6gev.pdf ** 4.5 GeV Run Sheets attachment:runsheets_4p5gev.pdf * Run Plan ** Run Plan attachment:run_plan.pdf h2. Later high energy running * Beam pipe requirements attachment:beampipe_req.pdf