Actions
  2019 Run Plans and Run Sheets » History » Revision 33
      « Previous |
    Revision 33/37
      (diff)
      | Next »
    
    Mireille Muhoza, 07/29/2019 06:23 PM 
    
    
Run Plans and Run Sheets¶
Summer 2019 Run Period¶
- Blank Run Sheets
	- New Configuration Sheet runsheet_pion.tgif.pdf
- Continuing Configuration Sheet runsheet2_pion.tgif.pdf
 
- Run Plans
	- Run Plan Spread Sheet pion_lowEkin_runplan.ods
- Run Plan runplan_lowQ2.pdf
- SIMC Plots (low Q2 Fpi) tphi_lowQ2.pdf
- Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf
 
- Run List
	- Runlist CSV file attachment:
- Standard kinematics standard.kinematics
 
- Run Sheets
	- 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) optics_2p7gev.pdf
- 2.7 GeV Run Sheets runsheets_2p7gev.pdf
- 3.6 GeV Run Sheets runsheets_3p6gev.pdf
- 4.5 GeV Run Sheets runsheets_4p5gev.pdf
 
- Run Plan
	- Run Plan run_plan.pdf
 
Later high energy running¶
- Beam pipe requirements beampipe_req.pdf
Updated by Mireille Muhoza over 6 years ago · 33 revisions