Project

General

Profile

HV map » History » Version 3

Jixie Zhang, 01/23/2021 07:21 AM

1 1 Jixie Zhang
h1. HV map
2
3 2 Jixie Zhang
This figure shows how each detector is connected to fadc and HV crate (at jlab).  
4
5
6
h1. HV map for FTBF beam test
7
8
HV for FADC channel 0 to 7:
9
  SC1   SC2 Ecal1  Ecal2 Ecal3  PrSh1  PrSh2  PrSh3
10 3 Jixie Zhang
-1260 -1280  -760   -860  -880  -1640  -1480  -1800  <<--  1~8GeV
11
-1260 -1280  -720   -820  -840  -1640  -1480  -1800  <<--  8~12GeV 
12
-1260 -1280  -600   -680  -720  -1640  -1480  -1760  <<-- 12~16GeV 
13 2 Jixie Zhang
14
15
16
This setting was also used for some 1GeV calibrations 
17
-1260 -1300  -880   -920  -940  -1640  -1440  -1800  <--  <1GeV