Project

General

Profile

Run Plan and Projected Event Rates » History » Revision 3

Revision 2 (David Flay, 01/14/2021 11:38 PM) → Revision 3/6 (David Flay, 01/14/2021 11:40 PM)

h1. Run Plan and Projected Event Rates 

 The full run plan is posted in the attachment below.    The overview of beam energies as distributed across each shift are shown below !!