1 1 Alexandre Camsonne
h1. April 2th 2026
2
* Updates
3
** GEM
4
*** gas is flowing
5
*** checked APVs, one idaho backplane might have issue ( potentially 3 bad ones ) - ideally need 6 2-slot backplanes, UVA pixels and different space - 8 x 1 slot but still need to make adapters - maybe will check with electronics group if they can make adpaters 
6
, other GEMs - check idaho backplanes should have enough ( 2 UVA chambers - Florian comes - 2 backplanes from Florian - one good idaho backplane + 2 fixed )
7
*** will try to look at signal this afternoon
8
*** MPOD control with command line possible
9
*** need to make LV adapter for MPOD LV - need to check if DAC HCAL box could work
10
*** need to figure SRS  
11 2 Alexandre Camsonne
*** buy microHMDI cables or adapters : 10 to 12$ on New Eggs 
12 1 Alexandre Camsonne
** Detectors
13
*** being worked on by Todd next week
14
*** will use ECal block for cosmics
15
** DAQ
16
*** trying to take cosmics with GEM
17
*** setup VTP FADC crate in ESB
18
*** Lecroy : needed for ECal, can use MPOD for now
19
** MRPC
20
*** need detector to GRINCH NINO adapter
21
*** need vfTDC setup