1 1 Alexandre Camsonne
h1. April 9th 2020
2
3
*VMM3
4
** Ed received VMM3 evaluation boards
5
** had to order some parts to supply power
6
** loaded Virtualbox on laptop, just installed Centos 8, small screen still, still need to get network going, need to install ROOT and software
7
** will give installed software on Virtual Box to Ed
8
** power supply  should be adequate, need about 15 Watts, 36 W Power supply 
9
** more expertise from Ben and Bryan
10
** might try to go through wireless router
11
12
*FADC
13
**Ben wrapped existing software for Ed to start from it
14
15
*APV25
16
**project ready to be tested by Ben
17
** should we turn on crates in clean room ? Need access for test to connect MPD. Current setup 4 crates in clean room, SSP in one crate , MPDs in other crate, 12 or 10 MPDs to SSP, need low voltage for APVs. ( located underneath 5 layer cosmics setup ) - Power could be turned on - Fibers ? Previous ones are too short - 2 long fibers - enough to read 28 MPDs - 
18
Need permission from Rolf for access but access might be possible if we make a good case for it
19
**VTP readout adapter board : after Mark Taylor done with current project
20
21
*HAWAI TOF : ASOC - need some cables to test more
22
23
*Starting paperwork for contract for UVA, UMass, De Geronimo
24
25
*Need to check with Chris if any upcoming SD order for VXS crates
26
27
*need reviewer from JLab side for SoLID : maybe in May ( or postponed to June ) Martin Purschke (BNL) , Dave Abbott (JLab) 
28
29
*need to work on quaterly report