December 10th 2020 » History » Version 3
Alexandre Camsonne, 12/10/2020 03:15 PM
| 1 | 1 | Alexandre Camsonne | h1. December 10th 2020 |
|---|---|---|---|
| 2 | |||
| 3 | 2 | Alexandre Camsonne | * Ecal discussion |
| 4 | 3 | Alexandre Camsonne | ** DAQ running |
| 5 | ** working on decoder to look at data |
||
| 6 | ** will try PMTs from Alexandre to test preshower which is noisy |
||
| 7 | ** Jixie plan to book the truck and lodging for beginning of year |
||
| 8 | ** trying to find an adapter for MAPMT too |
||
| 9 | ** David and Jixie will evaluate expected rates for different energies |
||
| 10 | 2 | Alexandre Camsonne | |
| 11 | 3 | Alexandre Camsonne | |
| 12 | 1 | Alexandre Camsonne | * Updates |
| 13 | 3 | Alexandre Camsonne | ** VMM |
| 14 | *** Ben helped Ed for code for 1 gigE on developement board - know what to change to get it working - trying to get it done before Christmas break. Software from Ben available to read out data with a computer |
||
| 15 | *** migration from 12 to 128 channels : could try 10 gigE link - can use 10 gigE directly since it is backward compatible |
||
| 16 | *** will look at how to put board on detector and take data with source |
||
| 17 | *** layout work with Jeff - will meet with Gianluigi at some point to have look on new design |
||
| 18 | 1 | Alexandre Camsonne | ** APV |
| 19 | 3 | Alexandre Camsonne | *** still simulation - can saturate VME bus in VME2eSST - and focusing on SBS TEDF setup for testing later |
| 20 | *** will switch to VTP code after ( in January for FADC first and after SSP for MPD readout ) |
||
| 21 | *** optical to VTP board for middle of December - can use the VTP front panel - |
||
| 22 | ** FADC |
||
| 23 | *** FADC code done and ready to be tested for VXS readout |
||
| 24 | *** TI oscillator at 50 MHz |
||
| 25 | 2 | Alexandre Camsonne | *** summary from Hanjie https://redmine.jlab.org/attachments/download/1116/FADC_dt3%20(1).pdf |