December 15th 2025 » History » Version 1
Alexandre Camsonne, 12/18/2025 01:38 PM
| 1 | 1 | Alexandre Camsonne | h1. December 15th 2025 |
|---|---|---|---|
| 2 | * ESB |
||
| 3 | ** ePAS approved, need ESC001 |
||
| 4 | ** pulled power cables |
||
| 5 | ** connected VME crates, and check current draw around 3A |
||
| 6 | ** need to install TI, VTP in VME crates |
||
| 7 | ** Computer : DAQ and CODA setup on solidpc1, works with external and internal trigger - FADC working with pedestal - need to try with signal |
||
| 8 | ** still need setup VTP for GEM |
||
| 9 | * GEM |
||
| 10 | ** All electronics is there : 7 or 8 MPDs, 20 APVs, need to check if Florian has his MPD, need back plane and adapters, can borrow 2 QSFP payload from Hall C |
||
| 11 | ** need 1 V1495 |
||
| 12 | ** need make adapter for uRGroove |
||
| 13 | ** LV power supply for testing, check with Ellen if we can borrow the TDK supplies |
||
| 14 | ** Fan out box |
||
| 15 | ** Gas system : 1 can use |
||
| 16 | ** UVA detector late Januray at earliest |
||
| 17 | ** Florian MPD in PRAD setup - might need the APVs |
||
| 18 | ** VMM |
||
| 19 | *** Jeff has all 6 boards - will bring to DAQ lab for testing - Ching and Alex will learn with Harsh |
||
| 20 | *** LV : 12 V - Check MPDOD LV available - check monitoring - 14 to 15 V if 12 V needed - need check cable length |
||
| 21 | *** check Bill supply |
||
| 22 | *** VMM testing setup |
||
| 23 | *** VMM readout : single module - |
||
| 24 | *** plan copper transceivers |
||
| 25 | *** Ed implementation GBT |
||
| 26 | *** lpGBT implementation |
||
| 27 | *** need to cooling |
||
| 28 | **MRPC |
||
| 29 | ***got link to NALU software - 8 channels |
||
| 30 | ***vfTDC - checking to borrow NINO from SBS |
||
| 31 | ***64 channels of SAMPIC - need to check for updated software |
||
| 32 | **HV |
||
| 33 | *** MPOD, CAEN |
||
| 34 | **Data rates and volume for Hanjie |
||
| 35 | **Need to check with Hanjie for network setup |
||
| 36 | ** need to pull network cable f |
||
| 37 | **Cerenkov |
||
| 38 | *** FADC based readout |
||
| 39 | *** Gas system - manual - need to check who takes care of t |
||
| 40 | *** might setup MAROC and SSP |