February 26th 2026 » History » Version 3
Alexandre Camsonne, 02/26/2026 01:23 PM
| 1 | 1 | Alexandre Camsonne | h1. February 26th 2026 |
|---|---|---|---|
| 2 | |||
| 3 | * Updates |
||
| 4 | ** GEM |
||
| 5 | *** DAQ working |
||
| 6 | *** 1 GEM UVA on site |
||
| 7 | *** gas system being assembled and 2 bottle of N2 arriving tomorrow |
||
| 8 | *** need HV for testing with detector ( Alex MPOD today or Friday) |
||
| 9 | *** need to coordinate when HV is on |
||
| 10 | *** did quick test with VMM in test lab, might have seen hint of signals, but noisy with self triggering, will try with external trigger, I got the software on laptop, need to try in ESB |
||
| 11 | *** need to put together cosmics triggers |
||
| 12 | *** uRWell on site, one UVA chamber |
||
| 13 | *** need check on hirose adapters - |
||
| 14 | *** backplanes : 2 x 2 backplanes from florian, 4 from Dustin, could use 5 slots if needed |
||
| 15 | *** need to design VMM frame |
||
| 16 | |||
| 17 | ** detector |
||
| 18 | *** needs to be put together, hardware to be ordered |
||
| 19 | 2 | Alexandre Camsonne | *** take SHV patch from Hall A ? |
| 20 | 1 | Alexandre Camsonne | |
| 21 | ** Cerenkov |
||
| 22 | *** check if we have cable for the sum, could try to take cosmics |
||
| 23 | *** gas system : test ? |
||
| 24 | |||
| 25 | ** ARC DAQ setup |
||
| 26 | *** can take data |
||
| 27 | *** done with Cerenkov test |
||
| 28 | |||
| 29 | ** Hall C |
||
| 30 | *** can preinstall |
||
| 31 | *** VXS crates and cables |
||
| 32 | *** lock up March 20th |
||
| 33 | 3 | Alexandre Camsonne | |
| 34 | **TOF |
||
| 35 | *** need update firmware of digitizer |
||
| 36 | *** cable for output of MRPC |
||