February 5th 2026 » History » Revision 1

Revision 1/2 | Next »
Alexandre Camsonne, 02/05/2026 01:37 PM


February 5th 2026
  • Updates
    • GEM
      • test APVs : 60 good APVs passed low level, need to take pedestal runs
      • talk to Florian for how signals are distributed on MPDs : 5 MPD for GEM, uRWell and uR Groove, 3 left fo additionnal detectors
      • need distribution board from SBS to gather signal on MPDs Ching-Him will look for them, Moller does not use them
      • talked with Xinzhan about pixel readout GEM : use APV but different spacing from existing GEM - would be good to make 1 and 2 APVs slot backplane
      • Huang will bring a detector - still waiting for GEM - only 1 GEM + Florian's detector
      • no update on LV : can ease boxes in EEL , 5V, MPOD can do 6V but need to check current
      • sent email to SRS for Hirose to panasonic -
      • asked to Dustin McNulty : 2 2xAPVs backplane we can loan - bring next time he is at the lab
      • HV : ESB - 2 GEM CAEN crates need board can check with Bill need up to 4 kV, MPOD one board can go to 6 kV - 8 channels - might need break up HV - Alex will try to set up a Lecroy
      • VMM : need 12 V supply - might have one in Testlab but not rad hard - check and maybe use for initial testing
      • CODA : config for GEM, need to set up optical connection - need to add transceiver and fiber
      • checked cable from SBS : cables are still hot

  • Cerenkov
    • will try DB9 cable - will try to turn it on at some point
    • readout with FADC - need to check if still getting sum of PMTs
  • MRPC
    • laptop setup for sampling electronics, cannot talk to boxes for now - maybe need firmware update
    • other channels readout with TDC, need to figure how to get signal out : NINO board or go to NIM electronics, will need to make adapter
  • Timeline installation
    • all part to assemble detector support, Eric will put it together on Friday
    • need to decide when we go in the Hall - and check with Jerry and tech to make space and have installation
    • some cables need to be moved to Hall C -
    • bunker locations still need to be defined
    • layout HV cables
    • check rack space for crates
    • start to setup crates in Hall C
    • need optical fiber - need to get from Hall A
    • need to install new computer in Hall C - counting house
  • BNC cables for FADC - basket of cables
    • use multiwire cables - ECAL available