1 1 Alexandre Camsonne
h1. February 5th 2026
2
* Updates
3
** GEM
4
*** test APVs : 60 good APVs passed low level, need to take pedestal runs
5
*** talk to Florian for how signals are distributed on MPDs : 5 MPD for GEM, uRWell and uR Groove, 3 left fo additionnal detectors
6
*** need distribution board from SBS to gather signal on MPDs Ching-Him will look for them, Moller does not use them
7
*** talked with Xinzhan about pixel readout GEM : use APV but different spacing from existing GEM - would be good to make 1 and 2 APVs slot backplane
8
*** Huang will bring a detector - still waiting for GEM - only 1 GEM + Florian's detector
9
*** no update on LV : can ease boxes in EEL , 5V, MPOD can do 6V but need to check current
10
*** sent email to SRS for Hirose to panasonic - 
11
*** asked to Dustin McNulty : 2 2xAPVs backplane we can loan - bring next time he is at the lab
12
*** HV : ESB - 2 GEM CAEN crates need board can check with Bill need up to 4 kV, MPOD one board can go to 6 kV - 8 channels - might need break up HV - Alex will try to set up a Lecroy
13
*** VMM : need 12 V supply - might have one in Testlab but not rad hard - check and maybe use for initial testing
14
*** CODA : config for GEM, need to set up optical connection - need to add transceiver and fiber
15
*** checked cable from SBS : cables are still hot
16
17
** Cerenkov
18
*** will try DB9 cable - will try to turn it on at some point
19
*** readout with FADC - need to check if still getting sum of PMTs
20
21
** MRPC
22
*** laptop setup for sampling electronics, cannot talk to boxes for now - maybe need firmware update
23
*** other channels readout with TDC, need to figure how to get signal out : NINO board or go to NIM electronics, will need to make adapter
24
25
** Timeline installation
26
*** all part to assemble detector support, Eric will put it together on Friday
27
*** need to decide when we go in the Hall - and check with Jerry and tech to make space and have installation
28
*** some cables need to be moved to Hall C - 
29
*** bunker locations still need to be defined
30
*** layout HV cables 
31
*** check rack space for crates 
32
*** start to setup crates in Hall C
33
*** need optical fiber - need to get from Hall A
34
*** need to install new computer in Hall C - counting house 
35
36
*** BNC cables for FADC - basket of cables 
37
**** use multiwire cables - ECAL available