h1. January 8th 2026
2
* Updates ESB
3
** Network pulled and put switch should have network 196 
4
** GEM
5
*** booted MPD crate
6
*** tried to boot VTP crate, issue with controller 
7
*** Ching can pull out extension cable from SBS, can give extension
8
*** 2 payload boars for up to 8 MPDs
9
*** 9 MPDs in crate
10
*** can setup SBS backplane with one or a few APVs to take pedestals and test software
11
*** Zhiwen gave github to previous GEM software, need to discuss and figure out what decoders are needed
12
*** VMM : use ethernet readout and might use long cables as back up for supply
13
*** need to check for power supply for VMM, need to check if we can use electronics group one or use the MPOD.
14
*** Harsh getting started with VMM readout
15 2 Alexandre Camsonne
*** 30 m HDMI found if needed : need to check how many - 10 m x 20
16 1 Alexandre Camsonne
** ECal
17
*** Zhongling moved boards to crate, just need to hook up  network and boot the crate
18
*** he will move the computer to the test area
19
**MRPC
20
*** moved cables on table near other racks
21
*** Sanghwa started installing software for NALU chips on laptop
22
** HV
23
*** need to get some up and controls
24
*** Lecroy 
25
*** MPOD bring crate and set up - start with web interface
26
*** CAEN crate 
27
*** controls EPICS
28
29
* To do list :
30
** network
31
*** check with network people if we can have dedicated fiber
32
**check in Hall : electronics rack location and network connection
33 2 Alexandre Camsonne
34
* ECal electronics for Zhihong
35
** FADC, SD, TI , VTP, old VME CPU - need to check all working before shipping
36
** CAEN controller : will try to run with CODA
37
38
* Test stand detector group 
39
** will meet detector group at 2 :30 to setup FADC for PMTs LED tests
40 3 Alexandre Camsonne
41
* add to new GEM chip paper