Actions
May 28th 2026 » History » Revision 2
« Previous |
Revision 2/3
(diff)
| Next »
Alexandre Camsonne, 05/28/2026 01:16 PM
May 28th 2026
*Updates
- GEM
- tested all APV, mapping to IC2 and APV.
- wiki page with information for the trackers
- will take cost
- we saw signals on all trackers besides one direction for uRGroovw
- 1 gas system approved, 2 on the way
- leak not bad at 2 or 3 psi
- Cal
- setting up cosmic
- error run not ending
- checking scintillators coincidence
- will try to take data this evening for ECal
- will check rest of scintillators and cables
- Survey was done
- Gas Cherenkov
- gas system on way
- will look at Cherenkov signal in hall
- need extension for control of gas
- move in Hall next Tuesday
- tested all APV, mapping to IC2 and APV.
- wiki page with information for the trackers
- will take cost
- we saw signals on all trackers besides one direction for uRGroovw
- 1 gas system approved, 2 on the way
- leak not bad at 2 or 3 psi
- setting up cosmic
- error run not ending
- checking scintillators coincidence
- will try to take data this evening for ECal
- will check rest of scintillators and cables
- gas system on way
- will look at Cherenkov signal in hall
- need extension for control of gas
Updated by Alexandre Camsonne 9 days ago · 2 revisions