1 1 Alexandre Camsonne
h1. November 11th 2022
2 2 Alexandre Camsonne
3
4
5
*Updates VMM
6
**some transceivers work in ARISTA switch, got a few
7
**Radiation LV design started, could be ready beginning of next year
8
**ethernet link 
9
**ready to move to EEL to test with GEM : need to look at how to support the card, will look at setup, power supply can handle mutiple card (IP and configure multiple boards ), need firmware to handle several card, need to fan out trigger, clck and sync reset, need 160 MHz, with external generator, got fan out card FanIO rev3, 
10
**low noise with external pulser so far
11
**looking at 10 bit readout will be interesting to compare with 6 bit
12
**Bryan suggesting using config files to make config of boards easier
13
**one board with test socket : still need to be tested , could use extender if need to use, 10 inch cable could put electronics farther, and allow shielding, need to check if fiber better rad hardness - 5 flexes on hand seems enough for 1 chambers
14
**EEL setup : Gas and HV ready, might need a NIM crate, 3 racks still in Test Lab, look for NIM crate for cosmics, trigger board , VME discriminator,
15
Ed has small VME crate
16
17
*CAEN FADC
18
**will test with pulser
19
**discussion with CAEN about looking before trigger ( they said it should be possible )
20
21
*checking for contract with CERN, RD51 for small quantities
22
23
*more FPGAs for new board : 16 on hands + 3 eval , lead time still very long