November 19th 2020 » History » Version 2
Hanjie Liu, 11/19/2020 03:48 PM
| 1 | 1 | Alexandre Camsonne | h1. November 19th 2020 |
|---|---|---|---|
| 2 | |||
| 3 | * Updates |
||
| 4 | ** VMM3 : code for readout is done, and simulated for 12 channels. Code can handle up to 4 triggers in the window |
||
| 5 | 5 MHz burst rate capability, need to 1 gigE wrapper from Ben |
||
| 6 | ** scale code to 128 channels : might have bottlenecks for 128 channels, group in to 16 groups done in parallel to improve speed |
||
| 7 | *** prototype board design from Arizona: still waiting for design . Connector for power settled : high power connector |
||
| 8 | *** delay in VMM fabrication will try to get other chips for first production |
||
| 9 | *** GBT chip procurement |
||
| 10 | |||
| 11 | |||
| 12 | ** APV25 |
||
| 13 | |||
| 14 | 2 | Hanjie Liu | ** UMass test stand : |
| 15 | 1 | Alexandre Camsonne | |
| 16 | ** ASOC : trigger |
||
| 17 | |||
| 18 | ** Calorimeter : still 2 modules to be fixed - DAQ |
||
| 19 | |||
| 20 | * SAMPA : get 50 SAMPA chips for prototype - advise to buy their boards from BNL - plan to get 25 000 |