1 | 1 | Alexandre Camsonne | h1. September 3rd 2020 |
---|---|---|---|
2 | |||
3 | 2 | Alexandre Camsonne | * Updates |
4 | 3 | Alexandre Camsonne | ** VMM3 |
5 | *** Progress with Jeff, almost done with schematics ( 8 layers 1 mm pitch FPGA ), still tweaking taking Ben and William feedback, Oscillator to be chosen for ethernet, could use clock from GBT link. |
||
6 | *** Parts in for evaluation board, eval board powered up - need ribbon cables made to connect to eval board - |
||
7 | *** Possible test : could borrow gas system and HV if needed |
||
8 | *** VMM3 eval board : reloaded firmware and board operating correctly, might be pull up resistor which has issues |
||
9 | **** test external trigger : did not work but might miss jumper |
||
10 | **** trying different integration time : for 200 ns 100 ns, no trigger 50 ns ans 25 ns with pulser, need to understand threshold setting |
||
11 | 1 | Alexandre Camsonne | |
12 | 3 | Alexandre Camsonne | ** APV25 : |
13 | *** INFN : sbs-aonl account created on all computers triton atedf3 sbsvme20 - readout list need to be adapted - |
||
14 | MPD setup using VME. Issues with configuration with optical - plan to do with VME |
||
15 | |||
16 | |||
17 | ** ASOC : met with Hawai people , still issues, might be hardware, discussion for having a spare |
||
18 | |||
19 | 2 | Alexandre Camsonne | * FNAL test beam |
20 | 3 | Alexandre Camsonne | ** possible beam test at FNAL : December 9th and 16th - 12 hours beam every day - expect 2 days to setup system |
21 | ** Manpower : Jixie taking lead and willing to drive |
||
22 | ** FNAL MWPC separate DAQ - need to bring DAQ for our detectors |
||
23 | ** Xinzhan could help for Fermilab setup , Kondo could be interested - one week before beam test would be safe |
||
24 | ** DAQ system : 4 modules + 3 preshower = minimum 6 channels - scintillator trigger ? Need to look for scintillator trigger : at least |
||
25 | 2 weeks for testing at JLab |
||
26 | ** lead plate 6 or 7 mm ? 1 or 2 radiation length - need to check if there are issues to lead loaning and with Fermilab if safety issues |
||
27 | |||
28 | |||
29 | *Write-up |
||
30 | ** text from Ed and Ben |
||
31 | ** Alex working on draft for Friday |
||
32 | |||
33 | |||
34 | *Nilanga : mention PRAD2 and LAD with large area GEMs, opportunity to test VMM3 |
||
35 | 20 000 channels |
||
36 | 2 wafers = 200 chips = 12 000 channels |
||
37 | 2 years or more - hit rate low ( Hall B ) - if use GBT trigger and clock but need FELIX boards for readout |
||
38 | if read with Ethernet need clock and trigger to be developped - 1 GBT for 2 VMM - one FELIX 48 low rate links |
||
39 | GBT is in initial design. Ed has a few GBT and GBT SCA left but need to get more. GBT 40 to 50 $ and optical |
||
40 | 250 $ - 300 $ per board - could lower cost with more VMM per boards |
||
41 | |||
42 | *Xinzhan waiting for paperwork, might be ready mid September |
||