Task #481
openTask #476: Calibrations
HMS DC
100%
Description
Stephen will keep this updated.
Files
Updated by Stephen Kay over 5 years ago
- % Done changed from 0 to 50
Script for running the analysis runs through two replays and does the calibration in the middle. I've also created a "checker" script that plots the drift time for each wire with electron PID. According to the README, a plot such as this should be flat if the calibration has worked.
So far, the SHMS looks like this once replayed but the HMS does not! Need to figure out what's going on with the HMS.
Also the SHMS code currently tries to find the NGC for PID, I've edited the code to comment this out and look at the HGC instead.
Updated by Stephen Kay over 5 years ago
Some files from my talk on 26/8/19 - https://redmine.jlab.org/documents/69
Updated by Stephen Kay over 5 years ago
- File HMS_DC_Calib_Check_Run5158.pdf HMS_DC_Calib_Check_Run5158.pdf added
- % Done changed from 50 to 70
DC calibration script seems to be working for both HMS and SHMS chambers. Made a short script to produce some comparison plots. Improves considerably post calibration. Now need to examine stability of chambers over different run periods/periods of time. Will need to establish how frequently we need a calibration.
Updated by Stephen Kay about 5 years ago
- File HMS_DC_Calib_Check_Run7952.pdf HMS_DC_Calib_Check_Run7952.pdf added
- File HMS_DC_Comparison_Runs_5154_5158.pdf HMS_DC_Comparison_Runs_5154_5158.pdf added
- File KaonLT_Meeting_10_9_19.pdf KaonLT_Meeting_10_9_19.pdf added
- % Done changed from 70 to 80
Good progress being made on the DC calibrations. Things look to be improving and it looks relatively stable. Need to examine a larger range of runs.
Updated by Richard Trotta over 2 years ago
- Status changed from In Progress to Closed
- % Done changed from 80 to 100
Updated by Richard Trotta over 2 years ago
- Status changed from Closed to Resolved