5 | 13 | Muhammad Junaid | | *Fall 2021/Summer 2022 Run* | - | %{background:lightgreen}Completed% | |
6 | | *Calibrations* | 2 months | %{background:yellow}Ongoing% | |
||
7 | | *Lumi Studies (includes FADC studies)* | 6 months | %{background:orange}On Deck% | |
||
8 | | *HEEP Studies (efficiencies, PID and offsets)* | 8 months | %{background:red}To Do% | |
||
9 | | *Physics Production Studies* | 2 months | %{background:red}To Do% | |
||
10 | | *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% | |
||
11 | | *Form factor extraction* | 1 - 2 week | %{background:red}To Do% | |
||
12 | 16 | Muhammad Junaid | | *Scaling Study* | 1 week | %{background:red}To Do% | |
13 | 1 | Jacob Murphy | |
14 | 12 | Muhammad Junaid | This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (junaid@jlab.org) and Nathan Heinrich (heinricn@uregina.ca). |
15 | 1 | Jacob Murphy | |
16 | h2. +Ongoing+ |
||
17 | |||
18 | 15 | Muhammad Junaid | **%{background:yellow}Expected to be completed in the start of July, 2023%** |
19 | 1 | Jacob Murphy | |
20 | 6 | Jacob Murphy | h3. Calibrations **%{background:yellow}In Progress%** |
21 | 4 | Jacob Murphy | |
22 | 6 | Jacob Murphy | * Kinematic Check |
23 | ** Jacob |
||
24 | ** Ensure Kinematics are correctly labeled in analysis |
||
25 | 9 | Jacob Murphy | *** Check 2021 Kinematic Settings |
26 | *** Check 2021 Offsets |
||
27 | *** Check 2022 Kinematic Settings |
||
28 | *** Check 2022 Offsets |
||
29 | |||
30 | |||
31 | 8 | Jacob Murphy | ** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods) |
32 | *** Good way to determine runs with issues as the ratio should be constant with current/rate |
||
33 | 1 | Jacob Murphy | |
34 | 6 | Jacob Murphy | * Timing Cuts |
35 | ** Jacob |
||
36 | ** ADC/TDC timing windows should be checked/applied for all run periods |
||
37 | |||
38 | 15 | Muhammad Junaid | * HMS+SHMS DC (Junaid) |
39 | ** In Progress |
||
40 | 1 | Jacob Murphy | ** Carlos worked on this analysis, finding drift times card-by-card |
41 | |||
42 | 15 | Muhammad Junaid | * Calorimeter (Junaid) |
43 | 1 | Jacob Murphy | ** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240) |
44 | |||
45 | 15 | Muhammad Junaid | * HGCer (Nathan) |
46 | ** In Progress |
||
47 | 1 | Jacob Murphy | ** Find SPE peak (low event run) |
48 | |||
49 | 15 | Muhammad Junaid | * NGCer (Nathan) |
50 | 6 | Jacob Murphy | ** No SPE peak to find |
51 | ** Check width of peak (high event run) |
||
52 | *** width is root n of mean value |
||
53 | ** Script is available (Cameron C. did it for XEM 2) |
||
54 | 3 | Jacob Murphy | |
55 | 15 | Muhammad Junaid | * HMS Cer (Nathan) |
56 | ** In Progress |
||
57 | 6 | Jacob Murphy | ** Find the SPE peak |
58 | 1 | Jacob Murphy | |
59 | 15 | Muhammad Junaid | * Aerogel (Nathan) |
60 | ** Completed |
||
61 | 1 | Jacob Murphy | |
62 | 15 | Muhammad Junaid | * HMS+SHMS Hodoscope (Jacob) |
63 | 1 | Jacob Murphy | ** Dave Mack/Carlos Yero/Jacob |
64 | ** 2021 SHMS calibrations in good shape |
||
65 | 6 | Jacob Murphy | ** 2021 HMS calibrations should be double-checked |
66 | ** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintain throughout the run period |
||
67 | |||
68 | 7 | Jacob Murphy | |
69 | |||
70 | |||
71 | * Saturation Corrections to Optical Matrices |
||
72 | ** Jacob |
||
73 | ** HMS 6.6 GeV |
||
74 | *** Carbon-Sieve |
||
75 | **** DONE |
||
76 | *** Elastic Delta Scan |
||
77 | **** DONE |
||
78 | ** HMS 6.8 GeV |
||
79 | *** Carbon-Sieve |
||
80 | **** In-progress |
||
81 | *** Elastic Delta Scan |
||
82 | **** To-do |
||
83 | ** HMS 5.9 GeV |
||
84 | *** Carbon-Sieve |
||
85 | **** To-do |
||
86 | *** Elastic Delta Scan |
||
87 | **** To-do |
||
88 | ** HMS 5.6 GeV |
||
89 | 1 | Jacob Murphy | *** Carbon-Sieve |
90 | 7 | Jacob Murphy | **** To-do |
91 | *** Elastic Delta Scan |
||
92 | **** To-do |
||
93 | ** SHMS 8.0 GeV |
||
94 | 1 | Jacob Murphy | *** Jacob needs to meet with Holly/Mark to confirm procedure here |
95 | *** Carbon-Sieve |
||
96 | **** To-do |
||
97 | *** Elastic Delta Scan |
||
98 | **** To-do |
||
99 | |||
100 | |||
101 | |||
102 | * Boiling Studies |
||
103 | 15 | Muhammad Junaid | ** On Deck |
104 | 1 | Jacob Murphy | ** 2022 Single-arm studies |
105 | ** fADC Mode 10 Deadtime studes (COIN scan) |
||
106 | ** Other luminosity scans |
||
107 | |||
108 | 7 | Jacob Murphy | * Offsets from HeeP Coin/Singles data |
109 | 15 | Muhammad Junaid | ** To Do |
110 | |||
111 | * Physics Production Studies |
||
112 | ** To Do |
||
113 | |||
114 | * LT Separation Studies |
||
115 | ** To Do |
||
116 | ** Iterative process |
||
117 | |||
118 | * Form factor extraction (Junaid) |
||
119 | ** To Do |
||
120 | |||
121 | * Scaling Study (Nathan) |
||
122 | ** To Do |