h1. Analysis Tasks
4
5 25 Muhammad Junaid
| *Summer-2019/Fall-2021/Summer-2022 Run* | Sep 2022 | %{background:lightgreen}Completed% |
6
| *Calibrations* | Nov 2023 | %{background:lightgreen}Completed% |
7 24 Muhammad Junaid
| *Efficiency Studies* | 2 months | %{background:yellow}On going% |
8 19 Muhammad Junaid
| *Lumi Studies (includes FADC studies)* | 6 months | %{background:orange}On Deck% |
9 26 Muhammad Junaid
| *HEEP Studies (PID and offsets)* | 6 months | %{background:orange}On Deck% |
10 13 Muhammad Junaid
| *Physics Production Studies* | 2 months | %{background:red}To Do% |
11
| *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% |
12 17 Muhammad Junaid
| *Form Factor extraction* | 1 - 2 week | %{background:red}To Do% |
13 16 Muhammad Junaid
| *Scaling Study* | 1 week | %{background:red}To Do% |
14 1 Jacob Murphy
15
This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca).
16 26 Muhammad Junaid
17
h2. +Completed+
18
19 1 Jacob Murphy
20
h2. +Ongoing+
21
22 15 Muhammad Junaid
**%{background:yellow}Expected to be completed in the start of July, 2023%**
23 1 Jacob Murphy
24 6 Jacob Murphy
h3. Calibrations **%{background:yellow}In Progress%**
25 4 Jacob Murphy
26 6 Jacob Murphy
* Kinematic Check
27
** Jacob
28
** Ensure Kinematics are correctly labeled in analysis
29 9 Jacob Murphy
*** Check 2021 Kinematic Settings
30
*** Check 2021 Offsets
31
*** Check 2022 Kinematic Settings
32
*** Check 2022 Offsets
33
34
35 8 Jacob Murphy
** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods)
36
*** Good way to determine runs with issues as the ratio should be constant with current/rate
37 1 Jacob Murphy
38 6 Jacob Murphy
* Timing Cuts
39
** Jacob
40
** ADC/TDC timing windows should be checked/applied for all run periods
41
42 15 Muhammad Junaid
* HMS+SHMS DC (Junaid)
43
** In Progress
44 1 Jacob Murphy
** Carlos worked on this analysis, finding drift times card-by-card
45
46 15 Muhammad Junaid
* Calorimeter (Junaid)
47 1 Jacob Murphy
** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240)
48
49 15 Muhammad Junaid
* HGCer (Nathan)
50
** In Progress
51 1 Jacob Murphy
** Find SPE peak (low event run)
52
53 15 Muhammad Junaid
* NGCer (Nathan)
54 6 Jacob Murphy
** No SPE peak to find
55
** Check width of peak (high event run)
56
*** width is root n of mean value
57
** Script is available (Cameron C. did it for XEM 2)
58 3 Jacob Murphy
59 15 Muhammad Junaid
* HMS Cer (Nathan)
60
** In Progress
61 6 Jacob Murphy
** Find the SPE peak
62 1 Jacob Murphy
63 15 Muhammad Junaid
* Aerogel (Nathan)
64
** Completed
65 1 Jacob Murphy
66 15 Muhammad Junaid
* HMS+SHMS Hodoscope (Jacob)
67 1 Jacob Murphy
** Dave Mack/Carlos Yero/Jacob
68
** 2021 SHMS calibrations in good shape
69 6 Jacob Murphy
** 2021 HMS calibrations should be double-checked
70
** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintain throughout the run period
71
72 7 Jacob Murphy
73
74
75
* Saturation Corrections to Optical Matrices
76
** Jacob
77
** HMS 6.6 GeV
78
*** Carbon-Sieve
79
**** DONE
80
*** Elastic Delta Scan
81
**** DONE
82
** HMS 6.8 GeV
83
*** Carbon-Sieve
84
**** In-progress
85
*** Elastic Delta Scan
86
**** To-do
87
** HMS 5.9 GeV
88
*** Carbon-Sieve
89
**** To-do
90
*** Elastic Delta Scan
91
**** To-do
92
** HMS 5.6 GeV
93 1 Jacob Murphy
*** Carbon-Sieve
94 7 Jacob Murphy
**** To-do
95
*** Elastic Delta Scan
96
**** To-do
97
** SHMS 8.0 GeV
98 1 Jacob Murphy
*** Jacob needs to meet with Holly/Mark to confirm procedure here
99
*** Carbon-Sieve
100
**** To-do
101
*** Elastic Delta Scan
102
**** To-do
103
104
105
106
* Boiling Studies
107 15 Muhammad Junaid
** On Deck
108 1 Jacob Murphy
** 2022 Single-arm studies
109
** fADC Mode 10 Deadtime studes (COIN scan)
110
** Other luminosity scans
111
112 7 Jacob Murphy
* Offsets from HeeP Coin/Singles data
113 15 Muhammad Junaid
** To Do
114
115
* Physics Production Studies	
116
** To Do
117
118
* LT Separation Studies
119
** To Do
120
** Iterative process
121
122
* Form factor extraction (Junaid)
123
** To Do
124
125
* Scaling Study (Nathan)
126
** To Do