h1. Analysis Tasks
4
5 25 Muhammad Junaid
| *Summer-2019/Fall-2021/Summer-2022 Run* | Sep 2022 | %{background:lightgreen}Completed% |
6
| *Calibrations* | Nov 2023 | %{background:lightgreen}Completed% |
7 24 Muhammad Junaid
| *Efficiency Studies* | 2 months | %{background:yellow}On going% |
8 19 Muhammad Junaid
| *Lumi Studies (includes FADC studies)* | 6 months | %{background:orange}On Deck% |
9 26 Muhammad Junaid
| *HEEP Studies (PID and offsets)* | 6 months | %{background:orange}On Deck% |
10 13 Muhammad Junaid
| *Physics Production Studies* | 2 months | %{background:red}To Do% |
11
| *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% |
12 17 Muhammad Junaid
| *Form Factor extraction* | 1 - 2 week | %{background:red}To Do% |
13 16 Muhammad Junaid
| *Scaling Study* | 1 week | %{background:red}To Do% |
14 1 Jacob Murphy
15
This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca).
16 26 Muhammad Junaid
17 30 Muhammad Junaid
h2. +Completed Tasks+
18 39 Muhammad Junaid
19
h3. Detector Calibrations **%{background:lightgreen}Completed%**
20 26 Muhammad Junaid
21 27 Muhammad Junaid
* Kinematic Check Done
22
** Ensure Kinematics are correctly labeled in the analysis
23
*** Check 2021 Kinematic Settings
24
*** Check 2021 Offsets (still needs to be checked)
25
*** Check 2022 Kinematic Settings
26
*** Check 2022 Offsets (still needs to be checked)
27 1 Jacob Murphy
28 27 Muhammad Junaid
29
** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods)
30
*** Good way to determine runs with issues as the ratio should be constant with current/rate
31
32
* Timing Cuts
33
** Nathan
34
** ADC/TDC timing windows should be checked/applied for all run periods
35
36
* HMS+SHMS DC (Junaid)
37
** Carlos worked on this analysis, finding drift times card-by-card
38
** Completed
39
40
* Calorimeter (Junaid)
41
** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240)
42
** Completed
43
44
* HGCer (Nathan)
45
** Find SPE peak (low event run)
46
** Completed
47
48
* NGCer (Nathan)
49
** No SPE peak to find
50
** Check width of peak (high event run)
51
*** width is root n of mean value
52
** Script is available (Cameron C. did it for XEM 2)
53
** Completed
54
55
* HMS Cer (Nathan)
56
** Find the SPE peak
57
** Completed
58
59
* Aerogel (Nathan)
60
** Completed
61
62 32 Muhammad Junaid
* HMS+SHMS Hodoscope (Jacob, Junaid, Nathan)
63 27 Muhammad Junaid
** Dave Mack/Carlos Yero/Jacob
64
** 2021 SHMS calibrations in good shape
65
** 2021 HMS calibrations should be double-checked
66 33 Muhammad Junaid
** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintained throughout the run period
67
** Did recalibrations because files were missing. 
68 32 Muhammad Junaid
** Finished Timewalk Calibrations. (Nathan)
69
** Finished VpCalib Calibrations. (Junaid)
70
** Completed
71 40 Muhammad Junaid
h2. Full Replays of PionLT Data
72 1 Jacob Murphy
73 40 Muhammad Junaid
h3. +Ongoing+
74 1 Jacob Murphy
75
**%{background:yellow}Expected to be completed in the Jan, 2024%**
76
77 40 Muhammad Junaid
h4. Efficiency Studies **%{background:yellow}In Progress%**
78 35 Muhammad Junaid
79 34 Muhammad Junaid
* Efficiency Studies (Junaid)
80
** Updated DEF-Cut files
81
** Done Setting up Report files
82
** Setting replay scripts
83 6 Jacob Murphy
84 7 Jacob Murphy
85
86
* Saturation Corrections to Optical Matrices
87
** Jacob
88
** HMS 6.6 GeV
89
*** Carbon-Sieve
90
**** DONE
91
*** Elastic Delta Scan
92
**** DONE
93
** HMS 6.8 GeV
94
*** Carbon-Sieve
95
**** In-progress
96
*** Elastic Delta Scan
97
**** To-do
98
** HMS 5.9 GeV
99
*** Carbon-Sieve
100
**** To-do
101
*** Elastic Delta Scan
102
**** To-do
103
** HMS 5.6 GeV
104
*** Carbon-Sieve
105 1 Jacob Murphy
**** To-do
106 7 Jacob Murphy
*** Elastic Delta Scan
107
**** To-do
108
** SHMS 8.0 GeV
109
*** Jacob needs to meet with Holly/Mark to confirm procedure here
110 1 Jacob Murphy
*** Carbon-Sieve
111
**** To-do
112
*** Elastic Delta Scan
113
**** To-do
114
115 40 Muhammad Junaid
h5. +Upcoming+
116 1 Jacob Murphy
117
* Boiling Studies
118
** On Deck
119 15 Muhammad Junaid
** 2022 Single-arm studies
120 1 Jacob Murphy
** fADC Mode 10 Deadtime studes (COIN scan)
121
** Other luminosity scans
122
123 7 Jacob Murphy
* Offsets from HeeP Coin/Singles data
124 34 Muhammad Junaid
** On Deck
125 15 Muhammad Junaid
126
* Physics Production Studies	
127
** To Do
128
129
* LT Separation Studies
130
** To Do
131
** Iterative process
132
133
* Form factor extraction (Junaid)
134
** To Do
135
136
* Scaling Study (Nathan)
137
** To Do