Analysis Tasks » History » Version 46
Muhammad Junaid, 01/04/2024 03:38 PM
1 | 1 | Jacob Murphy | {{>toc}} |
---|---|---|---|
2 | |||
3 | h1. Analysis Tasks |
||
4 | |||
5 | 25 | Muhammad Junaid | | *Summer-2019/Fall-2021/Summer-2022 Run* | Sep 2022 | %{background:lightgreen}Completed% | |
6 | | *Calibrations* | Nov 2023 | %{background:lightgreen}Completed% | |
||
7 | 24 | Muhammad Junaid | | *Efficiency Studies* | 2 months | %{background:yellow}On going% | |
8 | 19 | Muhammad Junaid | | *Lumi Studies (includes FADC studies)* | 6 months | %{background:orange}On Deck% | |
9 | 26 | Muhammad Junaid | | *HEEP Studies (PID and offsets)* | 6 months | %{background:orange}On Deck% | |
10 | 13 | Muhammad Junaid | | *Physics Production Studies* | 2 months | %{background:red}To Do% | |
11 | | *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% | |
||
12 | 17 | Muhammad Junaid | | *Form Factor extraction* | 1 - 2 week | %{background:red}To Do% | |
13 | 16 | Muhammad Junaid | | *Scaling Study* | 1 week | %{background:red}To Do% | |
14 | 1 | Jacob Murphy | |
15 | This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca). |
||
16 | 26 | Muhammad Junaid | |
17 | 30 | Muhammad Junaid | h2. +Completed Tasks+ |
18 | 39 | Muhammad Junaid | |
19 | h3. Detector Calibrations **%{background:lightgreen}Completed%** |
||
20 | 26 | Muhammad Junaid | |
21 | 27 | Muhammad Junaid | * Kinematic Check Done |
22 | ** Ensure Kinematics are correctly labeled in the analysis |
||
23 | *** Check 2021 Kinematic Settings |
||
24 | *** Check 2021 Offsets (still needs to be checked) |
||
25 | *** Check 2022 Kinematic Settings |
||
26 | *** Check 2022 Offsets (still needs to be checked) |
||
27 | 1 | Jacob Murphy | |
28 | 27 | Muhammad Junaid | |
29 | ** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods) |
||
30 | *** Good way to determine runs with issues as the ratio should be constant with current/rate |
||
31 | |||
32 | * Timing Cuts |
||
33 | ** Nathan |
||
34 | ** ADC/TDC timing windows should be checked/applied for all run periods |
||
35 | |||
36 | * HMS+SHMS DC (Junaid) |
||
37 | ** Carlos worked on this analysis, finding drift times card-by-card |
||
38 | ** Completed |
||
39 | |||
40 | * Calorimeter (Junaid) |
||
41 | ** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240) |
||
42 | ** Completed |
||
43 | |||
44 | * HGCer (Nathan) |
||
45 | ** Find SPE peak (low event run) |
||
46 | ** Completed |
||
47 | |||
48 | * NGCer (Nathan) |
||
49 | ** No SPE peak to find |
||
50 | ** Check width of peak (high event run) |
||
51 | *** width is root n of mean value |
||
52 | ** Script is available (Cameron C. did it for XEM 2) |
||
53 | ** Completed |
||
54 | |||
55 | * HMS Cer (Nathan) |
||
56 | ** Find the SPE peak |
||
57 | ** Completed |
||
58 | |||
59 | * Aerogel (Nathan) |
||
60 | ** Completed |
||
61 | |||
62 | 32 | Muhammad Junaid | * HMS+SHMS Hodoscope (Jacob, Junaid, Nathan) |
63 | 27 | Muhammad Junaid | ** Dave Mack/Carlos Yero/Jacob |
64 | ** 2021 SHMS calibrations in good shape |
||
65 | ** 2021 HMS calibrations should be double-checked |
||
66 | 33 | Muhammad Junaid | ** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintained throughout the run period |
67 | ** Did recalibrations because files were missing. |
||
68 | 32 | Muhammad Junaid | ** Finished Timewalk Calibrations. (Nathan) |
69 | ** Finished VpCalib Calibrations. (Junaid) |
||
70 | ** Completed |
||
71 | 42 | Muhammad Junaid | |
72 | h2. +Full Replays of PionLT Data+ |
||
73 | 44 | Muhammad Junaid | |
74 | 46 | Muhammad Junaid | * Full Replay Pass1 attachment:HFull_Replay_Pass1_&_Efficiency_Study.pdf |
75 | 1 | Jacob Murphy | |
76 | 40 | Muhammad Junaid | h3. +Ongoing+ |
77 | 1 | Jacob Murphy | |
78 | **%{background:yellow}Expected to be completed in the Jan, 2024%** |
||
79 | |||
80 | 40 | Muhammad Junaid | h4. Efficiency Studies **%{background:yellow}In Progress%** |
81 | 35 | Muhammad Junaid | |
82 | 34 | Muhammad Junaid | * Efficiency Studies (Junaid) |
83 | ** Updated DEF-Cut files |
||
84 | ** Done Setting up Report files |
||
85 | ** Setting replay scripts |
||
86 | 6 | Jacob Murphy | |
87 | 7 | Jacob Murphy | |
88 | |||
89 | * Saturation Corrections to Optical Matrices |
||
90 | ** Jacob |
||
91 | ** HMS 6.6 GeV |
||
92 | *** Carbon-Sieve |
||
93 | **** DONE |
||
94 | *** Elastic Delta Scan |
||
95 | **** DONE |
||
96 | ** HMS 6.8 GeV |
||
97 | *** Carbon-Sieve |
||
98 | **** In-progress |
||
99 | *** Elastic Delta Scan |
||
100 | **** To-do |
||
101 | ** HMS 5.9 GeV |
||
102 | *** Carbon-Sieve |
||
103 | **** To-do |
||
104 | *** Elastic Delta Scan |
||
105 | **** To-do |
||
106 | ** HMS 5.6 GeV |
||
107 | *** Carbon-Sieve |
||
108 | 1 | Jacob Murphy | **** To-do |
109 | 7 | Jacob Murphy | *** Elastic Delta Scan |
110 | **** To-do |
||
111 | ** SHMS 8.0 GeV |
||
112 | *** Jacob needs to meet with Holly/Mark to confirm procedure here |
||
113 | 1 | Jacob Murphy | *** Carbon-Sieve |
114 | **** To-do |
||
115 | *** Elastic Delta Scan |
||
116 | **** To-do |
||
117 | |||
118 | 41 | Muhammad Junaid | h2. +Upcoming+ |
119 | 1 | Jacob Murphy | |
120 | * Boiling Studies |
||
121 | ** On Deck |
||
122 | 15 | Muhammad Junaid | ** 2022 Single-arm studies |
123 | 1 | Jacob Murphy | ** fADC Mode 10 Deadtime studes (COIN scan) |
124 | ** Other luminosity scans |
||
125 | |||
126 | 7 | Jacob Murphy | * Offsets from HeeP Coin/Singles data |
127 | 34 | Muhammad Junaid | ** On Deck |
128 | 15 | Muhammad Junaid | |
129 | * Physics Production Studies |
||
130 | ** To Do |
||
131 | |||
132 | * LT Separation Studies |
||
133 | ** To Do |
||
134 | ** Iterative process |
||
135 | |||
136 | * Form factor extraction (Junaid) |
||
137 | ** To Do |
||
138 | |||
139 | * Scaling Study (Nathan) |
||
140 | ** To Do |