| 5 | 25 | Muhammad Junaid | | *Summer-2019/Fall-2021/Summer-2022 Run* | Sep 2022 | %{background:lightgreen}Completed% | |
| 6 | | *Calibrations* | Nov 2023 | %{background:lightgreen}Completed% | |
||
| 7 | 52 | Muhammad Junaid | | *Tracking Efficiency Studies* | 2 months | %{background:lightgreen}Completed% | |
| 8 | 50 | Muhammad Junaid | | *Detector Efficiency Studies* | 1 months | %{background:orange}On deck% | |
| 9 | | *Lumi Studies (includes FADC studies)* | 6 months | %{background:yellow}On going%| |
||
| 10 | | *HEEP Studies (PID and offsets)* | 6 months | %{background:yellow}On going% | |
||
| 11 | 13 | Muhammad Junaid | | *Physics Production Studies* | 2 months | %{background:red}To Do% | |
| 12 | | *LT Separation Studies* | 8 - 16 months | %{background:red}To Do% | |
||
| 13 | 17 | Muhammad Junaid | | *Form Factor extraction* | 1 - 2 week | %{background:red}To Do% | |
| 14 | 16 | Muhammad Junaid | | *Scaling Study* | 1 week | %{background:red}To Do% | |
| 15 | 1 | Jacob Murphy | |
| 16 | This is a summary page with the progress of the PionLT experiment. Above is a quick outline of our current progress. Below are tasks assigned to members of the group. Anyone who is part of the group may contribute to a task with suggestions and/or updates on progress. Please contact the assignee on a task-by-task basis for any queries. Anyone with general questions can contact Jacob Murphy (jm443918@ohio.edu), Muhammad Junaid (mjo147@uregina.org) and Nathan Heinrich (heinricn@uregina.ca). |
||
| 17 | 26 | Muhammad Junaid | |
| 18 | 30 | Muhammad Junaid | h2. +Completed Tasks+ |
| 19 | 39 | Muhammad Junaid | |
| 20 | h3. Detector Calibrations **%{background:lightgreen}Completed%** |
||
| 21 | 26 | Muhammad Junaid | |
| 22 | 27 | Muhammad Junaid | * Kinematic Check Done |
| 23 | ** Ensure Kinematics are correctly labeled in the analysis |
||
| 24 | *** Check 2021 Kinematic Settings |
||
| 25 | *** Check 2021 Offsets (still needs to be checked) |
||
| 26 | *** Check 2022 Kinematic Settings |
||
| 27 | *** Check 2022 Offsets (still needs to be checked) |
||
| 28 | 1 | Jacob Murphy | |
| 29 | 27 | Muhammad Junaid | |
| 30 | ** Per Peter Bosted's suggestion, look at ELCLEAN and BCM scalars (in report file) and determine stability (can also check previous run periods) |
||
| 31 | *** Good way to determine runs with issues as the ratio should be constant with current/rate |
||
| 32 | |||
| 33 | * Timing Cuts |
||
| 34 | ** Nathan |
||
| 35 | ** ADC/TDC timing windows should be checked/applied for all run periods |
||
| 36 | |||
| 37 | * HMS+SHMS DC (Junaid) |
||
| 38 | ** Carlos worked on this analysis, finding drift times card-by-card |
||
| 39 | ** Completed |
||
| 40 | |||
| 41 | * Calorimeter (Junaid) |
||
| 42 | ** Use defocused run (With the correct optical matrix, https://logbooks.jlab.org/entry/4050240) |
||
| 43 | ** Completed |
||
| 44 | |||
| 45 | * HGCer (Nathan) |
||
| 46 | ** Find SPE peak (low event run) |
||
| 47 | ** Completed |
||
| 48 | |||
| 49 | * NGCer (Nathan) |
||
| 50 | ** No SPE peak to find |
||
| 51 | ** Check width of peak (high event run) |
||
| 52 | *** width is root n of mean value |
||
| 53 | ** Script is available (Cameron C. did it for XEM 2) |
||
| 54 | ** Completed |
||
| 55 | |||
| 56 | * HMS Cer (Nathan) |
||
| 57 | ** Find the SPE peak |
||
| 58 | ** Completed |
||
| 59 | |||
| 60 | * Aerogel (Nathan) |
||
| 61 | ** Completed |
||
| 62 | |||
| 63 | 32 | Muhammad Junaid | * HMS+SHMS Hodoscope (Jacob, Junaid, Nathan) |
| 64 | 27 | Muhammad Junaid | ** Dave Mack/Carlos Yero/Jacob |
| 65 | ** 2021 SHMS calibrations in good shape |
||
| 66 | ** 2021 HMS calibrations should be double-checked |
||
| 67 | 33 | Muhammad Junaid | ** 2022 HMS and SHMS calibrations should ideally be done with defocused and maintained throughout the run period |
| 68 | ** Did recalibrations because files were missing. |
||
| 69 | 32 | Muhammad Junaid | ** Finished Timewalk Calibrations. (Nathan) |
| 70 | ** Finished VpCalib Calibrations. (Junaid) |
||
| 71 | ** Completed |
||
| 72 | 42 | Muhammad Junaid | |
| 73 | 40 | Muhammad Junaid | h3. +Ongoing+ |
| 74 | 1 | Jacob Murphy | |
| 75 | **%{background:yellow}Expected to be completed in the Jan, 2024%** |
||
| 76 | |||
| 77 | 40 | Muhammad Junaid | h4. Efficiency Studies **%{background:yellow}In Progress%** |
| 78 | 35 | Muhammad Junaid | |
| 79 | 34 | Muhammad Junaid | * Efficiency Studies (Junaid) |
| 80 | ** Updated DEF-Cut files |
||
| 81 | ** Done Setting up Report files |
||
| 82 | ** Setting replay scripts |
||
| 83 | 6 | Jacob Murphy | |
| 84 | 7 | Jacob Murphy | |
| 85 | |||
| 86 | * Saturation Corrections to Optical Matrices |
||
| 87 | ** Jacob |
||
| 88 | ** HMS 6.6 GeV |
||
| 89 | *** Carbon-Sieve |
||
| 90 | **** DONE |
||
| 91 | *** Elastic Delta Scan |
||
| 92 | **** DONE |
||
| 93 | ** HMS 6.8 GeV |
||
| 94 | *** Carbon-Sieve |
||
| 95 | **** In-progress |
||
| 96 | *** Elastic Delta Scan |
||
| 97 | **** To-do |
||
| 98 | ** HMS 5.9 GeV |
||
| 99 | *** Carbon-Sieve |
||
| 100 | **** To-do |
||
| 101 | *** Elastic Delta Scan |
||
| 102 | **** To-do |
||
| 103 | ** HMS 5.6 GeV |
||
| 104 | *** Carbon-Sieve |
||
| 105 | 1 | Jacob Murphy | **** To-do |
| 106 | 7 | Jacob Murphy | *** Elastic Delta Scan |
| 107 | **** To-do |
||
| 108 | ** SHMS 8.0 GeV |
||
| 109 | *** Jacob needs to meet with Holly/Mark to confirm procedure here |
||
| 110 | 1 | Jacob Murphy | *** Carbon-Sieve |
| 111 | **** To-do |
||
| 112 | *** Elastic Delta Scan |
||
| 113 | **** To-do |
||
| 114 | |||
| 115 | 41 | Muhammad Junaid | h2. +Upcoming+ |
| 116 | 1 | Jacob Murphy | |
| 117 | * Boiling Studies |
||
| 118 | ** On Deck |
||
| 119 | 15 | Muhammad Junaid | ** 2022 Single-arm studies |
| 120 | 1 | Jacob Murphy | ** fADC Mode 10 Deadtime studes (COIN scan) |
| 121 | ** Other luminosity scans |
||
| 122 | |||
| 123 | 7 | Jacob Murphy | * Offsets from HeeP Coin/Singles data |
| 124 | 34 | Muhammad Junaid | ** On Deck |
| 125 | 15 | Muhammad Junaid | |
| 126 | * Physics Production Studies |
||
| 127 | ** To Do |
||
| 128 | |||
| 129 | * LT Separation Studies |
||
| 130 | ** To Do |
||
| 131 | ** Iterative process |
||
| 132 | |||
| 133 | * Form factor extraction (Junaid) |
||
| 134 | 1 | Jacob Murphy | ** To Do |
| 135 | |||
| 136 | * Scaling Study (Nathan) |
||
| 137 | ** To Do |
||
| 138 | 49 | Muhammad Junaid | |
| 139 | h2. +Full Replays of PionLT Data+ |
||
| 140 | |||
| 141 | * Full Replay Pass1: attachment:Full_Replay_Pass1_&_Efficiency_Study.pdf |