Project

General

Profile

Actions

December 4th 2025 » History » Revision 2

« Previous | Revision 2/4 (diff) | Next »
Alexandre Camsonne, 12/04/2025 01:37 PM


December 4th 2025
*Status
  • GEM ( Ching _
    • All MPD and APVs are in ESB
    • need VTP and V1495 - CPU and TI
    • low voltage
    • 1 VXS crate + 1 VME crate for MPD
    • 2 QSF board in Hall C
    • got fibers from Hall C
    • backplanes and adapter : 5 slots - Florian has the one for his chamber - Need more 2 slots ideally - need to get adapter fro Stony Brook
    • most hardware - need to setup crate
    • EPAS can copy and paste Bill's EPAS
  • Computer
    • CPU TI SD - using sbsecal4 - need add VTP - SSP for MAROC
    • VMM3 board start to setup in ESB - we should have 6 of them - and start testing

**MRPC
  • 64 channels of SAMPIC
  • 8 channels AARDVARC and 8 channels ASOC
  • main readout of MRPC will be A/D and vfTDC
  • will borrow NINO chips from SBS for the readout
  • or NIM A/D
  • CDet software
  • EPAS
  • Infrastructure
    • new switch arriving in January
    • one small dumb switch in the rack - pull one 196 cable from rack in HKS
  • PMTs readout
    • scintillators
    • FADCs for PMT readout : Scintillator, Cerenkov
**Trigger
  • VTP
    *ECal single trigger
    *Scintillator
    • Ecal+Cerenkov
    • Pion trigger - scintillator after calorimeter
    • need volounters to program VTP
    • analog trigger -

EPAS
*copy from Bill

**Hall C
  • we need fibers for VTPs
  • need to check data rates and data volumes
High Voltage
Lecroy for PMTs
**MPGD : CAEN ? and SoLID Wiener
  • MRPC : HV Wiener - need
  • NPS crate in SHMS - Bill can find cards and help with slow control - have positive
  • LAD Crate -

Updated by Alexandre Camsonne 4 days ago · 2 revisions