Actions
December 4th 2025 » History » Revision 3
« Previous |
Revision 3/4
(diff)
| Next »
Alexandre Camsonne, 12/04/2025 01:43 PM
December 4th 2025
*Status
- GEM ( Ching _
- All MPD and APVs are in ESB
- need VTP and V1495 - CPU and TI
- low voltage
- 1 VXS crate + 1 VME crate for MPD
- 2 QSF board in Hall C
- got fibers from Hall C
- backplanes and adapter : 5 slots - Florian has the one for his chamber - Need more 2 slots ideally - need to get adapter fro Stony Brook
- most hardware - need to setup crate
- EPAS can copy and paste Bill's EPAS
- Computer
- CPU TI SD - using sbsecal4 - need add VTP - SSP for MAROC
- VMM3 board start to setup in ESB - we should have 6 of them - and start testing
**MRPC
- 64 channels of SAMPIC
- 8 channels AARDVARC and 8 channels ASOC
- main readout of MRPC will be A/D and vfTDC
- will borrow NINO chips from SBS for the readout
- or NIM A/D
- CDet software
- EPAS
- Infrastructure
- new switch arriving in January
- one small dumb switch in the rack - pull one 196 cable from rack in HKS
- All MPD and APVs are in ESB
- need VTP and V1495 - CPU and TI
- low voltage
- 1 VXS crate + 1 VME crate for MPD
- 2 QSF board in Hall C
- got fibers from Hall C
- backplanes and adapter : 5 slots - Florian has the one for his chamber - Need more 2 slots ideally - need to get adapter fro Stony Brook
- most hardware - need to setup crate
- EPAS can copy and paste Bill's EPAS
- CPU TI SD - using sbsecal4 - need add VTP - SSP for MAROC
- VMM3 board start to setup in ESB - we should have 6 of them - and start testing
**MRPC - 64 channels of SAMPIC
- 8 channels AARDVARC and 8 channels ASOC
- main readout of MRPC will be A/D and vfTDC
- will borrow NINO chips from SBS for the readout
- or NIM A/D
- CDet software
- EPAS
- new switch arriving in January
- one small dumb switch in the rack - pull one 196 cable from rack in HKS
- PMTs readout
- scintillators
- FADCs for PMT readout : Scintillator, Cerenkov
- VTP
*ECal single trigger
*Scintillator- Ecal+Cerenkov
- Pion trigger - scintillator after calorimeter
- need volounters to program VTP
- analog trigger -
EPAS
copy from Bill
*Hall C
- we need fibers for VTPs
- need to check data rates and data volumes
High Voltage
Lecroy for PMTs
**MPGD : CAEN ? and SoLID Wiener - MRPC : HV Wiener - need
- NPS crate in SHMS - Bill can find cards and help with slow control - have positive
- LAD Crate -
**HKS- DC need more ribbon adapters for vfTDC
- can look at data with trigger time
- FADC v2 for ENGE
- still need to test V3
- finished test KDC1 and KDC2 ok
- will test all ENGE hodoscope data with FADC
- will test EDC
- LVDS repeater ? - Bill shortened the cable length - 125 ft - 150 ft - 2 to 3 % signal loss - might only need for ENGE - 40 ribbon cables might need repeater
Updated by Alexandre Camsonne 4 days ago · 3 revisions