Project

General

Profile

January 15th 2026 » History » Version 3

Alexandre Camsonne, 01/15/2026 01:07 PM

1 1 Alexandre Camsonne
h1. January 15th 2026
2 2 Alexandre Camsonne
* GEM
3 1 Alexandre Camsonne
** pulled extension cables to be surveyed
4
** might not have enough HDMI - might need to open basket from SBS - need to count 20 or 30 meters cable
5
** need to now cable length need
6
** MPD crate booted, still need to check, need LV cables to power APV
7
** need hostname for MPD crate and VTP , all on 196 subnet
8
** VTP crate CPU booted solidgem2 , need to boot VTP
9
** Talked with Harsh, just getting starting with  VMM, will let us know when he starts looking at the readout
10 3 Alexandre Camsonne
* ESB
11 1 Alexandre Camsonne
** computer working for FADC readout, need to add VTP
12
** SoLID HV MPOD crate in HKS area used by Jiwan, will move to SoLID : should have a few channel of PMTs, need to check if can use LV board for VMM
13 3 Alexandre Camsonne
* ARC detector
14 1 Alexandre Camsonne
** installed VXS crate with FADC for Zhiwen
15
** readout list installed need to test with pulser and detector