March 12th 2026 » History » Version 2
Alexandre Camsonne, 03/12/2026 01:21 PM
| 1 | 1 | Alexandre Camsonne | h1. March 12th 2026 |
|---|---|---|---|
| 2 | * Updates |
||
| 3 | ** GEM |
||
| 4 | *** relocated crates to small racks for bunker, need floor map to set up cables. One more backplane broken, will try to fix but not clear it will work. Florian has a few spares. Alex will try to get more made |
||
| 5 | *** cables : 10 m HDMI cables labeled, enough for test beam. LV more than 10 m. SHV and BNC cables labeled ( 200 feet ) |
||
| 6 | *** Jiwan put MPOD crate on Hall A EPICS, can control it now |
||
| 7 | *** Gas system ready : GEM flushing with N2, Ar/CO2 is ready to go |
||
| 8 | *** Alex will set external trigger for source and cosmics test |
||
| 9 | *** will test VMM next week |
||
| 10 | *** Things to go in Hall C : 2 VXS crates, cables, half rack will be brought later |
||
| 11 | ** HV power |
||
| 12 | *** HV patch panels taken out from Hall A |
||
| 13 | *** need 48 channels - need to check how many MPOD channels we have for PMT |
||
| 14 | *** might need to add a Lecroy for PMTs |
||
| 15 | *** need to check rating for big HV cable |
||
| 16 | ** MRPC |
||
| 17 | *** can be put in support |
||
| 18 | *** flush with N2 if needed |
||
| 19 | ** Cerenkov |
||
| 20 | *** check gas system |
||
| 21 | *** cosmics ? |
||
| 22 | *** Cerenkov RAM ? |
||
| 23 | ** ECal |
||
| 24 | *** 2 modules |
||
| 25 | ** DAQ |
||
| 26 | *** CODA server set up, need to set up the ROCs |
||
| 27 | *** need to add network adapter |
||
| 28 | ** Fibers |
||
| 29 | *** need to pull fibers from counting house to rack |
||
| 30 | *** |
||
| 31 | ** FADC ESB |
||
| 32 | *** need setup VTP readout for FADC |
||
| 33 | 2 | Alexandre Camsonne | *** need setup FADC trigger |