Project

General

Profile

March 12th 2026 » History » Version 2

Alexandre Camsonne, 03/12/2026 01:21 PM

1 1 Alexandre Camsonne
h1. March 12th 2026
2
* Updates
3
** GEM
4
*** relocated crates to small racks for bunker, need floor map to set up cables. One more backplane broken, will try to fix but not clear it will work. Florian has a few spares. Alex will try to get more made
5
*** cables : 10 m HDMI cables labeled, enough for test beam. LV more than 10 m. SHV and BNC cables labeled ( 200 feet ) 
6
*** Jiwan put MPOD crate on Hall A EPICS, can control it now
7
*** Gas system ready : GEM flushing with N2, Ar/CO2 is ready to go
8
*** Alex will set external trigger for source and cosmics test
9
*** will test VMM next week
10
*** Things to go in Hall C : 2 VXS crates, cables, half rack will be brought later
11
** HV power
12
*** HV patch panels taken out from Hall A  
13
*** need 48 channels - need to check how many MPOD channels we have for PMT 
14
*** might need to add a Lecroy for PMTs
15
*** need to check rating for big HV cable 
16
** MRPC
17
*** can be put in support
18
*** flush with N2 if needed 
19
** Cerenkov
20
*** check gas system 
21
*** cosmics ?
22
*** Cerenkov RAM ?
23
** ECal
24
*** 2 modules 
25
** DAQ
26
*** CODA server set up, need to set up the ROCs
27
*** need to add network adapter
28
** Fibers
29
*** need to pull fibers from counting house to rack
30
***
31
** FADC ESB
32
*** need setup VTP readout for FADC
33 2 Alexandre Camsonne
*** need setup FADC trigger