Actions
March 21 2024 » History » Revision 3
« Previous |
Revision 3/4
(diff)
| Next »
Alexandre Camsonne, 03/21/2024 02:02 PM
March 21 2024¶
- Updates VMM
- Working on L0 mode - Hall B planning to use
- Purchase for rad hard component for LHC : lpGBT and VTR+ and bPol 2.5 - for TDIS and SoLID - in queue for 14 months - letter of increase added because cost went up - increase quantity to have the SoLID ones - might be coming soon : lpGBT and bPol (2.5 -> 2.5 to 1.2) and bPol12 might come in a week - could make the radhard mezzanine - could use bPol for PRAD and SBS - can test and measure noise -
- VTR+ later
- interface from benchtop supply: design complete - still not ordered - need to be careful of spike at start - could ramp the supply
- Hall B has untested VMM - wants to make a 4 chips prototype - one engineer will test the VMM - will use one eval board with socket to test chips
- need to replace the desiccant for VMM
- SALSA : 50 MHz FADC -
- MPD - new version -
- Pixel chamber GEM - different pixel size - ~ 100 k channels
- check with Paolo, new MPD
- APV25 220nm process - SAMPA 120 ns - SALSA 65 nm - check if line still exist
- Status orders
- FADC ordered
- VTP ordered
- TI
- SD
- VXS - 24 ordered need 8 more
- VETROC
- MRPC electronics
- NALU ASOC and AARDVARC
- picoTDC
- SAMPIC
TDIS
*wirechamber - 1 ns
**SAMPA close to 2 ns with fitting of pulse at 20 MHz
Updated by Alexandre Camsonne 9 months ago · 3 revisions