h1. November 19th 2020
2
3
* Updates
4
** VMM3 : code for readout is done, and simulated for 12 channels. Code can handle up to 4 triggers in the window
5
5 MHz burst rate capability, need to 1 gigE wrapper from Ben
6
** scale code to 128 channels : might have bottlenecks for 128 channels, group in to 16 groups done in parallel to improve speed
7
*** prototype board design from Arizona: still waiting for design . Connector for power settled : high power connector
8
*** delay in VMM fabrication will try to get other chips for first production
9
*** GBT chip procurement 
10
11
12
** APV25 
13
14
** UMass test stand :
15
16
** ASOC : trigger
17
18
** Calorimeter : still 2 modules to be fixed - DAQ 
19
20
* SAMPA : get 50 SAMPA chips for prototype - advise to buy their boards from BNL - plan to get 25 000