November 19th 2020 » History » Version 1
Alexandre Camsonne, 11/19/2020 03:46 PM
1 | 1 | Alexandre Camsonne | h1. November 19th 2020 |
---|---|---|---|
2 | |||
3 | * Updates |
||
4 | ** VMM3 : code for readout is done, and simulated for 12 channels. Code can handle up to 4 triggers in the window |
||
5 | 5 MHz burst rate capability, need to 1 gigE wrapper from Ben |
||
6 | ** scale code to 128 channels : might have bottlenecks for 128 channels, group in to 16 groups done in parallel to improve speed |
||
7 | *** prototype board design from Arizona: still waiting for design . Connector for power settled : high power connector |
||
8 | *** delay in VMM fabrication will try to get other chips for first production |
||
9 | *** GBT chip procurement |
||
10 | |||
11 | |||
12 | ** APV25 |
||
13 | |||
14 | ** UMass test stand : |
||
15 | |||
16 | ** ASOC : trigger |
||
17 | |||
18 | ** Calorimeter : still 2 modules to be fixed - DAQ |
||
19 | |||
20 | * SAMPA : get 50 SAMPA chips for prototype - advise to buy their boards from BNL - plan to get 25 000 |