Project

General

Profile

October 28th 2021 » History » Version 4

Alexandre Camsonne, 10/28/2021 03:43 PM

1 1 Alexandre Camsonne
h1. October 28th 2021
2
3 2 Alexandre Camsonne
* Updates
4
** VMM
5 4 Alexandre Camsonne
*** issue with connector tolerance - solution using fixed and floating connectors 
6
*** send power board end of week
7
*** gave VMM Eval board to Xinzhan
8
*** Got 2nd VMM, working on software to 
9
*** Radioactive source area
10
*** ArCO2 gas 
11
*** can look at signal from VMM
12
*** Friday to Monday in UVA - to setup X-ray
13
*** VERSO : could use
14 2 Alexandre Camsonne
** APV
15 4 Alexandre Camsonne
*** working in Hall A 5.2 KHz 6 samples
16 2 Alexandre Camsonne
** FADC
17 3 Alexandre Camsonne
*** driver for ethernet adapater not loaded correctly - and should work - might need new kernel 
18 2 Alexandre Camsonne
** VTP 
19
*** New firmware is ready for multicrate ECAL trigger testing (fixed a bug with it early this week)
20
*** Trying to get solidvtp1 and 2 root mounts to be same as Hall A VTPs. solidvtp1 seems to mount it now, solidvtp2 doesn't
21
*** These VTPs we're (kernel) crashing often before, so this is why I want to run the same mounts as the Hall A VTPs (where we don't see this). Not sure if the issue will be gone after this mount change - if not I'll check if Bryan can figure it out and probably we can run as-is if we can at least get the VME crates online so we can remotely power cycle to recover
22 3 Alexandre Camsonne
23 4 Alexandre Camsonne
* new funding request
24
** will test radiation hardness next week
25
** new bPOL supply, GBT ordered
26
** might need to  switch to lpGBT and VTRx+ 
27
** TMR commercial software - evaluate cost
28
** filtering of VMM : ferrite saturates  - air core inductors are big - might be better if far from supply - could use linear regulator -
29
** TDIS : flex circuit board to get signal out