# Project Tracker Status Priority Subject Assignee Updated
318 PREX/CREX Task New Normal Beam Dump Shielding Engineering Robin Wines 05/25/2018 02:56 PM Actions
316 PREX/CREX Task New Normal Skyshine Fabrication 03/18/2018 11:55 AM Actions
315 PREX/CREX Task New Normal Skyshine Engineering Design Robin Wines 03/18/2018 11:55 AM Actions
311 PREX/CREX Task New Normal Pivot Test Assembly 03/01/2018 07:08 PM Actions
310 PREX/CREX Task New Normal Vacuum Through Septum 03/01/2018 07:08 PM Actions
309 PREX/CREX Task New Normal Q1 Collimator 03/01/2018 06:56 PM Actions
308 PREX/CREX Task New Normal Elastic Transport 03/01/2018 07:08 PM Actions
307 PREX/CREX Task New Normal Target Shielding 05/25/2018 02:57 PM Actions
306 PREX/CREX Task New Normal Beam Dump Shielding 05/25/2018 03:00 PM Actions
304 PREX/CREX Task New Normal Sieve Collimator Box 03/01/2018 06:43 PM Actions
302 PREX/CREX Task New Normal Engineering Tasks 05/25/2018 03:02 PM Actions
300 PREX/CREX Task New Normal Septum Support Mods Fabrication 03/01/2018 06:32 PM Actions
297 PREX/CREX Task New Normal Collimator Box Fabrication 03/01/2018 06:35 PM Actions
295 PREX/CREX Task New Normal Collimator Box 05/25/2018 02:58 PM Actions
294 PREX/CREX Task New Normal Quad Beampipe Fabrication 05/25/2018 03:02 PM Actions
293 PREX/CREX Task New Normal Quad Beampipe Engineering Robin Wines 05/25/2018 03:02 PM Actions
292 PREX/CREX Task New Normal Quad Beampipe 05/25/2018 03:02 PM Actions
291 PREX/CREX Task New Normal Septum Beampipe Fabrication 03/01/2018 06:27 PM Actions
290 PREX/CREX Task New Normal Septum Beampipe Engineering Robin Wines 03/01/2018 07:03 PM Actions
289 PREX/CREX Task New Normal Septum Beampipe 03/01/2018 06:37 PM Actions
288 PREX/CREX Task New Normal Beamline Magnetic Shielding Fabrication 03/01/2018 06:24 PM Actions
287 PREX/CREX Task New Normal Beamline Magnetic Shielding Engineering Robin Wines 03/01/2018 07:03 PM Actions
286 PREX/CREX Task New Normal Beamline Magnetic Shielding Calculations 05/25/2018 02:59 PM Actions
285 PREX/CREX Task New Normal Beamline Magnetic Shielding 05/25/2018 02:59 PM Actions
284 PREX/CREX Task New Normal Septum Pole Shims Fabrication 03/01/2018 06:19 PM Actions
283 PREX/CREX Task New Normal Septum Pole Shims Engineering Robin Wines 03/01/2018 07:03 PM Actions
282 PREX/CREX Task New Normal Septum Pole Shims 03/01/2018 06:38 PM Actions
281 PREX/CREX Task New Normal Septum Coil Fabrication 03/01/2018 06:15 PM Actions
279 PREX/CREX Task New Normal Septum Coil 03/01/2018 06:39 PM Actions
278 PREX/CREX Task New Normal PREX 03/01/2018 06:10 PM Actions
277 PREX/CREX Task New Normal PREX Installation 03/01/2018 06:10 PM Actions
273 PREX/CREX Task New Normal PREX Running 03/01/2018 06:10 PM Actions
234 Compton simulation Task New Normal 5 GeV 09/21/2017 02:54 PM Actions
233 Compton simulation Task New Normal 3GeV 09/21/2017 02:54 PM Actions
230 Compton simulation Task New Normal Report paper 08/01/2017 09:53 AM Actions
229 Compton simulation Task New Normal Documentation analysis 08/01/2017 09:45 AM Actions
228 Compton simulation Task New Normal Documentation simulation 08/01/2017 09:45 AM Actions
227 Compton simulation Task New Normal Documentation event generator Joshua Hoskins 09/21/2017 02:57 PM Actions
226 Compton simulation Task New Normal Study systematic with detector pitch David Gaskell 09/21/2017 02:50 PM Actions
225 Compton simulation Task New Normal Beam induced background 08/01/2017 09:41 AM Actions
224 Compton simulation Task New Normal Systematic and effect of background for different energies Joshua Hoskins 09/21/2017 02:54 PM Actions
223 Compton simulation Task New Normal More realistic geometry of detector and RP Joshua Hoskins 09/21/2017 02:54 PM Actions
218 SoLID Reconstruction Task New Normal SIDIS NH3 target reconstruction 06/27/2017 02:43 PM Actions
200 SoLID Reconstruction Task New Normal SIDIS NH3 track resolution with background 06/29/2017 11:10 PM Actions
114 SoLID Reconstruction Task New Normal SIDIS & J/Psi tracking characterization 06/18/2017 04:43 PM Actions
113 SoLID Reconstruction Task New Normal J/Psi target reconstruction 06/27/2017 01:32 PM Actions
112 SoLID Reconstruction Task New Normal SIDIS He3 target reconstruction 06/27/2017 03:17 PM Actions
108 SoLID Reconstruction Task New Normal PVDIS tracking characterization 06/27/2017 12:41 PM Actions
107 SoLID Reconstruction Task New Normal PVDIS target reconstruction 06/27/2017 01:35 PM Actions
706 BBCal_calibration Bug In Progress Normal Double peaking in ADC time (SH + PS) Provakar Datta 03/07/2023 02:46 PM Actions
(351-400/559) Per page: 25, 50, 100