h1. December 4th 2025
2
*Status
3
** GEM ( Ching _
4
*** All MPD and APVs are in ESB
5
*** need VTP and V1495 - CPU and TI
6
*** low voltage
7
*** 1 VXS crate + 1 VME crate for MPD 
8
*** 2 QSF board in Hall C 
9
*** got fibers from Hall C
10
*** backplanes and adapter : 5 slots - Florian has the one for his chamber - Need more 2 slots ideally - need to get adapter fro Stony Brook
11
*** most hardware - need to setup crate
12
*** EPAS can copy and paste Bill's EPAS
13 2 Alexandre Camsonne
** Computer
14 1 Alexandre Camsonne
*** CPU TI SD - using sbsecal4 - need add VTP - SSP for MAROC 
15 2 Alexandre Camsonne
***  VMM3 board start to setup in ESB - we should have 6 of them  - and start testing 
16 4 Alexandre Camsonne
** MRPC
17 1 Alexandre Camsonne
*** 64 channels of SAMPIC
18
*** 8 channels AARDVARC and 8 channels ASOC
19
*** main readout of MRPC will be A/D and vfTDC  
20
*** will borrow NINO chips from SBS for the readout
21
*** or NIM A/D
22
*** CDet software 
23
*** EPAS 
24 2 Alexandre Camsonne
** Infrastructure
25
*** new switch arriving in January
26 1 Alexandre Camsonne
*** one small dumb switch in the rack - pull one 196 cable from rack in HKS  
27
28 2 Alexandre Camsonne
** PMTs readout
29 1 Alexandre Camsonne
*** scintillators
30
*** FADCs for PMT readout : Scintillator, Cerenkov
31
32
33
**Trigger
34
*** VTP 
35
****ECal single trigger
36
****Scintillator
37
**** Ecal+Cerenkov
38
**** Pion trigger - scintillator after calorimeter
39
**** need volounters to program VTP  
40
**** analog trigger - 
41
**EPAS
42
***copy from Bill
43
**Hall C
44
*** we need fibers for VTPs
45
*** need to check data rates and data volumes 
46 2 Alexandre Camsonne
**High Voltage
47 1 Alexandre Camsonne
***Lecroy for PMTs
48
***MPGD : CAEN ? and SoLID Wiener 
49
*** MRPC : HV Wiener - need 
50
*** NPS crate in SHMS - Bill can find cards and help with slow control - have positive
51
*** LAD Crate -
52 3 Alexandre Camsonne
**HKS
53
**** DC need more ribbon adapters for vfTDC
54
**** can look at data with trigger time
55
**** FADC v2 for ENGE
56
**** still need to test V3
57
**** finished test KDC1 and KDC2 ok
58
**** will test all ENGE  hodoscope data with FADC
59
**** will test EDC
60
**** LVDS repeater ? - Bill shortened the cable length - 125 ft - 150 ft - 2 to 3 % signal loss - might only need for ENGE - 40 ribbon cables might need repeater