Task #865: Missing mass and invariant mass on full production data
Task #866: NPS Trigger electronics deadtime
Task #867: pi0 assymetry
Bug #875: Need apply HMS momentum correction
Task #880: Electronics deadtime not changing with current
Task #896: HCANA RCDB interface
Idea #904: Plotting the NPS Column Degradation vs Time
Feature #905: Hydra Deployment
Bug #922: Some calorimeter blocks at different temperature in display
Bug #926: HMS electron trigger efficiency
Task #930: cross check BCM vs other
Task #853: Full replay production
Task #924: SIMC NPS simulation
Task #939: HV stability plots
Task #943: Check HV in EPICS
Task #971: Summary DVCS data taking
Task #980: Summary special runs and efficiency
Task #982: First pass
Task #988: SIMC output documentation for pi0 and DVCS
Idea #1015: Do we need to take more dummy target single arm for DIS analysis ?
Bug #1016: Run plan for additionnal / missing data for boiling
Task #1017: Loop 3 data
Task #1018: Desinstallation supplies list
Bug #815: PMT with low gains
Bug #820: Interference HMS SHMS
Task #821: Adjust latency and FADC window
Task #836: Data with event blocking
Task #837: Deadtime studies
Task #950: HMS yield check by Peter
Task #844: Dead time analysis boiling runs
Task #845: Boiling runs analysis
Bug #1030: Target issue (a compendium of links)
Task #1031: y target vs raster X

Status

New
New
Resolved
New
Resolved
New
In Progress
In Progress
New
New
New
In Progress
In Progress
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
In Progress
In Progress
In Progress
In Progress
In Progress
New
New

Priority

Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Urgent
Normal
High
High
High
High
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Urgent
Normal

Updated

10/12/2023 10:26 AM
01/29/2024 09:58 AM
03/25/2024 10:12 AM
10/30/2023 10:46 AM
11/09/2023 09:22 AM
11/20/2023 10:48 AM
02/01/2024 10:15 AM
12/06/2023 02:12 PM
02/08/2024 09:57 AM
02/08/2024 10:08 AM
02/05/2024 10:13 AM
02/12/2024 10:03 AM
03/25/2024 10:31 AM
02/12/2024 10:03 AM
02/15/2024 10:44 AM
04/25/2024 10:30 AM
04/11/2024 10:19 AM
03/25/2024 10:32 AM
04/22/2024 10:07 AM
04/29/2024 10:02 AM
04/29/2024 04:16 AM
04/25/2024 10:18 AM
04/29/2024 02:01 PM
01/29/2024 09:59 AM
02/08/2024 09:59 AM
03/21/2024 10:40 AM
02/05/2024 09:50 AM
03/04/2024 08:36 PM
03/18/2024 10:41 AM
01/29/2024 10:12 AM
05/03/2024 01:49 PM
05/13/2024 08:55 PM
05/03/2024 06:15 PM
 
 
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
NPS
In Progress 0%
 