Project

General

Profile

Gantt

Filters

Zoom in Zoom out « March | May »

months from Apply Clear

The chart was truncated because it exceeds the maximum number of items that can be displayed (500)

Task #474: SHMS_Aerogel gain stability (Calibration)
Task #476: Calibrations
Task #477: Calorimeter
Task #478: Aerogel
Task #479: HG Cherenkov
Task #480: HMS Cherenkov
Task #481: HMS DC
Task #482: SHMS DC
Task #483: Hodoscope
Task #500: Ref Times and Detector Time Windows
Task #511: Efficiencies
Task #512: Tracking efficiency
Task #513: Trigger efficiency
Task #514: PID efficiency
Task #517: HMS cherenkov efficiency
Task #518: HMS calorimeter efficiency
Task #519: SHMS aerogel efficiency
Task #520: SHMS cherenkov efficiency
Task #521: SHMS calorimeter efficiency
Task #515: CPU and electronic live time
Task #516: COIN time and missing mass efficiency
Task #668: fADC efficiency
Task #669: SHMS pion absorption efficiency
Task #670: Cointime blocking efficiency
Task #672: X/Y positions and variance
Task #673: (S)HMS x/ytar positions and widths
Task #674: Q2, Epsilon, and Angle setting values
Task #551: RF time for SHMS PID
Task #552: BCM Calibrations
Task #553: Beam Energy calibrations
Task #557: EDTM
Task #558: Luminosity
Task #559: SHMS and HMS Optics Improvements
Task #560: Check stability of cointime peak
Task #561: Elastics
Task #562: Elastic single (HMS)
Task #563: Elastic coin
Task #564: Heepcheck offsets
Task #566: Full Replays
Task #567: Replay 1
Task #568: Replay 3
Task #569: Replay 4
Task #570: Replay 5
Task #571: Replay 6
Task #652: Replay 2
Task #555: Python analysis scripts
Task #556: SHMS tracking algorithm optimization and efficiencies
Task #565: Initial ep elastic cross-section checks
Task #667: Implementation of Bill's Cross-section Code
Task #671: Target Studies
Task #675: List of Hall C Replay Variables
Task #225: Beam induced background
Task #226: Study systematic with detector pitch
Task #227: Documentation event generator
Task #228: Documentation simulation
Task #229: Documentation analysis
Task #230: Report paper
Task #223: More realistic geometry of detector and RP
Task #224: Systematic and effect of background for different energies
Task #233: 3GeV
Task #234: 5 GeV
Support #354: Generator not compiling
Support #620: Thresholds script
Support #622: Network setup
Support #623: DAQ accounts
Support #624: DAQ switch script
Task #626: Computer stations
Bug #644: DAQ racks
Bug #645: Front end rack installed
Task #646: HV cabling
Task #647: Signal cabling
Task #648: Cosmics
Task #720: LE Offsets GRINCH
Bug #721: GRINCH TDC data is 1ns integers. Is that the resolution we expect?
Task #638: Hodo in Hall A
Task #639: Front end rack installed
Task #640: Cabling signals
Task #641: DAQ rack installed
Task #642: HV cabling
Task #643: Cosmics
Task #628: Software for beamline
Task #629: Software HV controls
Task #630: Software scalers
Task #631: HALOG
Task #632: checklist webpage
Task #633: Online analysis
Task #634: BTA : shift report
Task #772: GEM Gain Coefficient and Threshold Generation 1st-pass
Idea #788: Tabulated HCal Detection Efficiencies for various (nTPE) kinematics
Task #843: GEM Gain Coefficients for Pass 2 Mass Replay Calibration
Task #917: Implement He3 in SIMC
Bug #706: Double peaking in ADC time (SH + PS)
Bug #707: Look at the ADC time distributions of BBCal trigger sums
Bug #708: Look at the correlation of BBCal signal ADC time with BBCal trigger TDC time (readout by 1190)
Task #723: BBCAL ADC Time Alignment for Pass 2
Task #812: BBCAL Energy Calibration for Pass 2
Task #898: BBCAL calibration QA using sbs8 pass2_QA data
Task #724: GEM Crosstalk Analysis Summary
Task #663: Timing diagram
Task #664: Connect fibers
Task #665: VTP readout
Task #666: Cosmics
Task #658: SD recabling
Task #659: VETROC install
Task #660: VETROC readout
Task #655: Setup
Task #656: Training
Task #657: Test on GMn data
Task #653: EPICS scripts for 3 streams readout
Task #654: Stream Merger
Task #661: Fibers for MPD patch
Task #662: Add SBS VTP
Task #932: RF time check
Task #933: HCAL trigger firmware
Task #934: BB Shower VTP firmware
Task #937: Active analyzer FADC and TDC cabling
Bug #949: Ship 1190 for active analyzer
Task #961: Internet cable in the way
Task #962: HV cables to be cleaned up
Bug #965: Hodoscope channel issue
Bug #973: BBCAL noisy channels
Bug #984: Scalers not working
Task #985: Helicity board test
Task #986: Remote switch for HV
Task #936: GEM polarimeter cabling
Task #938: Reorganize MPDs connection in VTP crates
Task #967: order HV remote power switch
Task #968: Network cable clean up
Task #969: Take cosmics BB GEMs
Task #947: GEM calorimeter based selective readout
Task #954: ECAL testing during GEn RP
Task #964: Put HV computer on network
Task #981: Install VETROC crate
Task #963: Installation of repeaters and cables for CDet in Hall A
Task #983: Patch panel for TDC
Task #948: Make VETROC adapters
Task #649: Router installation
Task #393: Hodoscope Electronics
Task #579: Setup TS crate
Task #575: INFN cleanroom optical
Task #576: BigBite GEM readout setup
Task #583: Send common noise zero supression code to Paolo
Task #650: Install 1 more VXS crate weldment
Bug #597: Read out error with crate0 MPD14
Bug #598: Read out error with crate1 MPD12
Task #580: ADC setup
Task #581: Detector cabling layout
Task #582: Detector cabling
Task #592: Setup gate from TS
Bug #593: HCAL Pulser state readout not properly read out in CODA3 ROL
Feature #617: Re-configure F1 clock to use TI clock
Feature #618: Re-configure F1 clock to use TI clock
Bug #584: FADC scalers readout
Bug #619: Scalers rate for triggers
Task #651: BPM/Raster weldment
Task #577: VXS VETROC setup
Bug #578: Install CODA3 for CDet
Task #587: VETROC order
Task #627: Target ladder layout
Task #461: Refactor raster code
Bug #676: PipeliningModule::LoadBank calling TIBlobModule::LoadSlot with too short a length
Bug #80: Version 1.6 bugfixes
Bug #245: Low tracking efficiency with Tritium test data
Task #235: Miscellaneous version 1.6 issues & tasks
Feature #249: Forward-port remaining v1.5 features
Support #239: Move online documentation into Redmine Wiki
Support #238: Release & documentation management for version 1.6
Feature #39: Add timezone support to timestamps
Feature #41: Integrate VDC multihit analysis from APEX branch
Feature #42: Develop 3-parameter cluster fit algorithm
Feature #43: Handle drift distance sign ambiguities
Feature #44: Support choosing VDC cluster fitter via configuration
Feature #45: Consider t0 in matching clusters between lower and upper VDC chambers
Feature #47: Let THaRun autodetect run segments
Feature #48: THaSpectrometer/THaTrack should be made abstract base classes
Feature #56: THaAnalyzer should allow replay of multiple runs without re-init
Bug #63: Scaler event count wrong in end-of-run counter summary
Feature #79: Unit tests
Feature #241: Add functions for cut statistics to THaFormula
Bug #247: Version 1.7 bugfixes
Bug #55: THaFormula containing parameters may crash
Bug #59: SCons srcdist differs from Make version
Bug #62: Timezone differences with recent ROOT version
Bug #254: Support reading of all THaRunParameters from the run database
Feature #263: Support alternate prefix for reading database
Bug #342: SCons does not update shared library links when switching versions
Bug #460: Make CMake EVIO unpacking more robust
Feature #68: dbconvert utility
Feature #69: dbconvert: read individual input files
Feature #70: dbconvert: allow selection of detector names to convert
Feature #71: dbconvert: allow selection of detector types to convert
Feature #72: dbconvert: assign detector names to types on the fly
Feature #73: dbconvert: dry-run feature
Feature #74: dbconvert: copy comments from source to target files
Feature #75: dbconvert: support conversion date ranges
Bug #178: dbconvert should print failure summary
Feature #78: Output system improvements
Bug #50: Replay of multiple input files should save all Run_Data objects
Bug #51: Replace fEvtHdr.fEvtNum with absolute event counter
Feature #52: Output data should support integer types and more
Feature #66: Move ROOT output file handling into THaOutput
Feature #220: Support #include in output definition files
Feature #221: Support conditionals in output definition files
Feature #53: Replace THaVform with THaFormula
Feature #231: THaOutput cuts should be available in gHaCuts
Feature #76: Code reorganization
Feature #38: Split libraries into core and hall parts
Feature #40: Replace THa prefix with namespaces
Feature #46: Reorganization of src and hana_decode directories
Feature #49: THaHRS algorithm reorganization
Feature #274: CODA 3 data format
Feature #350: BankData class and support in decoder
Bug #407: Setting CODA version for files filtered with EVIO 4
Feature #333: Generalize warning/error logging for analysis modules
Feature #67: Global variables should know the object they're associated with
Feature #267: Event type handlers redesign
Task #429: Elastic Hydrogen Analysis
Task #458: Update collaboration information
Task #462: Question: Do we need to checkout radiator?
Task #997: Hodoscope Work at ESB
Task #994: ASSY 3
Task #995: ASSY 3 Light leaks and PMT issues
Task #996: ASSY 3 Optic Fibers
Task #1000: ASSY 6
Task #1002: ASSY 6 Optic Fibers
Task #1001: ASSY 6 Light leaks and PMT issues
Task #1008: Add LAD geometry in simulation
Task #1009: Add GEM materials in simulation
Task #1010: Simulation: LAD digitization
Task #1011: Simulation: GEM digitization
Task #1012: Reconstruction: LAD hits
Task #1013: Reconstruction: Combine GEM track and LAD hit
Task #1014: LAD event display/monitoring plots
Task #848: Install Partons on JLab Farm
Task #849: Interface with Pytorch
Task #882: Local installation Partons cfddac1b
Task #431: Develop Run plan
Task #432: Updated simulation with new experimental parameters
Task #433: Simulation of VCS signal using SIMC
Task #439: Develop and integrate beam and internal radiative corrections
Task #434: Simulation of pion backgrounds integrated into SIMC
Task #435: Simulation of accidentals in SIMC
Task #438: Replication of expected data
Task #436: Analysis software framework
Task #437: Testing of framework with simulation
Task #440: Determine Publication / Shift responsibilities
Task #441: Create shift sign-up page
Task #485: Reference time and detector time window cut study
Task #486: studying elastic data
Task #487: Setting up replay and hcana on farm
Task #488: studying pi0 data
Task #489: PID detector calibration
Task #490: BCM calibration
Task #491: Runlist / data quality
Bug #492: Update wiki with information about farm analysis
Task #493: Optics
Task #494: check if we need to use the shms calorimeter for the analysis?
Task #497: comparison of vcs data with simc
Task #498: implementing pi0 production and ability to turn on -off the shms scintillator panels in SIMC
Task #499: proton absorption study
Task #865: Missing mass and invariant mass on full production data
Task #866: NPS Trigger electronics deadtime
Task #867: pi0 assymetry
Bug #875: Need apply HMS momentum correction
Task #880: Electronics deadtime not changing with current
Task #896: HCANA RCDB interface
Idea #904: Plotting the NPS Column Degradation vs Time
Feature #905: Hydra Deployment
Bug #922: Some calorimeter blocks at different temperature in display
Bug #926: HMS electron trigger efficiency
Task #930: cross check BCM vs other
Task #853: Full replay production
Task #924: SIMC NPS simulation
Task #939: HV stability plots
Task #943: Check HV in EPICS
Task #971: Summary DVCS data taking
Task #980: Summary special runs and efficiency
Task #982: First pass
Task #988: SIMC output documentation for pi0 and DVCS
Idea #1015: Do we need to take more dummy target single arm for DIS analysis ?
Bug #1016: Run plan for additionnal / missing data for boiling
Task #1017: Loop 3 data
Task #1018: Desinstallation supplies list
Bug #815: PMT with low gains
Bug #820: Interference HMS SHMS
Task #821: Adjust latency and FADC window
Task #836: Data with event blocking
Task #837: Deadtime studies
Task #950: HMS yield check by Peter
Task #844: Dead time analysis boiling runs
Task #845: Boiling runs analysis
Task #702: Online GUI using ET
Task #735: DIS cross section
Task #740: Charge asymmetry monitoring setup
Task #745: HMS Optics calibration
Task #747: HMS timing cut
Task #748: HMS Cerenkov calibration
Task #749: HMS calorimeter calibration
Task #750: HMS drift chamber calibration
Task #792: Check replay speed and optimize for online
Task #793: Global Run Plan
Task #796: Hydra setup
Task #808: Add sync checks
Task #746: PID threshold optimization on HMS
Task #830: Cerenkov efficiency
Task #831: HMS Calorimeter efficency
Task #832: Hodoscope efficiency
Task #794: Physics plots
Task #855: Check and keep RCDB up to date and flag good and bad runs
Task #873: LD2 data quality
Task #738: Farm analysis setup
Task #900: Add information to the wiki on ROOTfile location and contents.
Task #901: Run all SKIM replays and save them to MSS
Task #742: BCM calibration
Task #928: Low current runs for BCM offsets
Task #944: Add Carbon boiling studies to BCM calibration ?
Task #945: Add plots for skim files
Task #942: Waveform analysis on DVCS data
Task #970: Check resolution with 200 ns window
Task #972: DVCS Data (Pi0 + Accidentals Subtraction)
Support #903: SKIM replays, saved to MSS
Task #897: Charge normalized DVCS yield analysis
Task #927: Need new calibration coefficient
Task #302: Engineering Tasks
Task #279: Septum Coil
Task #280: Septum Coil Engineering
Task #281: Septum Coil Fabrication
Task #285: Beamline Magnetic Shielding
Task #286: Beamline Magnetic Shielding Calculations
Task #287: Beamline Magnetic Shielding Engineering
Task #288: Beamline Magnetic Shielding Fabrication
Task #295: Collimator Box
Task #312: Collimator Design
Task #313: Collimator to Fabrication
Task #296: Collimator Box and Stand Engineering
Task #297: Collimator Box Fabrication
Task #301: Q1 Hard Water Connections
Task #298: Septum Support Mods
Task #299: Septum Support Mods Engineering
Task #300: Septum Support Mods Fabrication
Task #282: Septum Pole Shims
Task #283: Septum Pole Shims Engineering
Task #284: Septum Pole Shims Fabrication
Task #289: Septum Beampipe
Task #290: Septum Beampipe Engineering
Task #291: Septum Beampipe Fabrication
Task #292: Quad Beampipe
Task #293: Quad Beampipe Engineering
Task #294: Quad Beampipe Fabrication
Task #303: Radiation Shielding Components
Task #305: Skyshine
Task #314: Skyshine Calculation
Task #315: Skyshine Engineering Design
Task #316: Skyshine Fabrication
Task #307: Target Shielding
Task #320: Target Shielding Calculation
Task #321: Target Shielding Engineering
Task #322: Target Shielding Fabrication
Task #306: Beam Dump Shielding
Task #317: Beam Dump Shielding Calculation
Task #318: Beam Dump Shielding Engineering
Task #319: Beam Dump Shielding Fabrication
Task #304: Sieve Collimator Box
Task #308: Elastic Transport
Task #309: Q1 Collimator
Task #323: Q1 Collimator Calculation
Task #324: Q1 Collimator Engineering
Task #325: Q1 Collimator Fabrication
Task #310: Vacuum Through Septum
Task #326: Vacuum Through Septum Calculation
Task #327: Vacuum Transport Engineering
Task #328: Vacuum Transport Post-fit Engineering
Support #329: Vacuum Transport Fabrication
Task #311: Pivot Test Assembly
Support #332: Septum Vacuum Test Fit
Support #330: Septum Test Assembly
Support #331: Septum Coil Test
Task #278: PREX
Task #277: PREX Installation
Task #273: PREX Running
Support #139: Decoders for DAQ Modules
Support #170: MPD Decoder for GEMs - Test with Cosmic Stand Data
Support #171: F250 support
Support #140: Offline Analysis Skeleton
Support #147: ECal Skeleton and Sample Databases
Support #148: Coordinate Detector Skeleton and Sample Databases
Support #149: GEM Skeleton and Sample Databases
Feature #156: Pedestal and common mode noise identification and suppression
Support #150: Timing Hodoscope Skeleton and Sample Databases
Support #151: Bigbite Calorimeter Skeleton and Sample Databases
Support #155: GRINCH Skeleton and Sample Databases
Support #146: HCal Skeleton and Sample Databases
Support #152: GMn Experimental Configuration Support
Support #153: GEn Experimental Configuration Support
Support #154: GEp Experimental Configuration Support
Support #175: Bigbite Arm Skeleton
Support #176: SBS Arm Skeleton
Support #141: Simulation Digitized Output and Analysis
Support #158: Tracking simulation for neutron FFs
Support #160: Tracking Revisited for GEp
Support #162: Interface to analyzer/SBS-Offline
Support #161: Digitization for non-GEM systems
Support #268: GRINCH
Support #269: Hodoscope
Support #270: Integrated Output
Support #392: CDet digitization
Support #142: Detector event displays and calibration scripts
Support #165: Coordinate Detector
Support #166: Bigbite Calorimeter
Support #167: GRINCH
Support #169: Timing Hodoscope
Support #143: Simulated analysis for detector reconstruction
Support #144: Simulated analysis for form factor experiments
Support #145: Simulated analysis for SIDIS and TDIS experiments
Task #501: New GEM analysis for SBS
Support #502: Completion of libsbsdig
Support #503: merging cmu_dev with master
Idea #504: add crate and slot info in simulated data.
Feature #505: Add decoded data into the output
Bug #506: migrate libsbsdig to CMake
Idea #507: Add optional "trigger" selection for events treated as "signal"
Support #508: Include properly GEM digitization and merge redundent classes
Feature #509: Production of a easily readable output
Support #510: Add background in a flexible and efficient way+ remove bugs
Task #550: Rewrite libsbsdig
Feature #572: Add randomized background hits as an alternate of superimposing background files
Task #600: sbsdig_lw completion

Project

Status

Resolved
In Progress
Resolved
Resolved
Resolved
In Progress
Resolved
Resolved
Resolved
Resolved
In Progress
Resolved
Resolved
In Progress
In Progress
In Progress
Resolved
In Progress
In Progress
Resolved
In Progress
In Progress
New
New
New
New
New
Resolved
Resolved
Resolved
Resolved
In Progress
In Progress
Resolved
In Progress
In Progress
In Progress
New
In Progress
Resolved
In Progress
New
New
New
Resolved
Resolved
Resolved
In Progress
In Progress
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
Resolved
New
In Progress
In Progress
In Progress
Feedback
Feedback
Feedback
Feedback
Feedback
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
In Progress
New
In Progress
In Progress
New
New
New
New
New
New
New
In Progress
New
In Progress
New
New
New
New
New
New
In Progress
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
New
New
Resolved
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
New
New
New
New
New
New
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
In Progress
In Progress
New
In Progress
New
New
New
In Progress
New
In Progress
In Progress
Feedback
New
New
In Progress
In Progress
New
New
Feedback
In Progress
Resolved
Resolved
Resolved
In Progress
In Progress
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
In Progress
New
Resolved
Resolved
Resolved
New
New
New
New
New
New
New
Resolved
Resolved
Resolved
Resolved
In Progress
New
New
Resolved
Resolved
New
In Progress
New
In Progress
In Progress
New
New
Resolved
New
Resolved
New
In Progress
In Progress
New
New
New
In Progress
In Progress
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
In Progress
In Progress
In Progress
In Progress
In Progress
New
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Resolved
In Progress
New
New
Resolved
New
New
New
In Progress
New
In Progress
Resolved
In Progress
In Progress
New
In Progress
In Progress
In Progress
In Progress
New
In Progress
New
In Progress
In Progress
New
New
Resolved
New
New
New
New
New
New
Resolved
Resolved
In Progress
New
Resolved
In Progress
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
New
New
New
Resolved
New
New
New
In Progress
New
New
New
New
New
In Progress
New
New
New
Resolved
Resolved
New
New
New
New
New
New
New
New
New
Resolved
Resolved
Resolved
In Progress
Resolved
Resolved
Resolved
In Progress
Resolved
Resolved
Resolved
Resolved
In Progress
In Progress
In Progress
Resolved
In Progress
In Progress
In Progress
New
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
New
New
Resolved
Resolved
New
Resolved
Resolved
Resolved
Resolved
In Progress
In Progress

Priority

Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Low
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
High
Urgent
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Low
Normal
High
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Low
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Low
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
High
High
High
High
Normal
Normal
Normal
Normal
Normal
High
High
High
High
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Urgent
Normal
High
Urgent
High
High
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Low
High
Normal
High
Normal
Low
Normal
Normal
Normal
Normal
Low
Low
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Normal
High
High
High
High
Normal
Normal
Normal
Normal
High
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Urgent
Urgent
Urgent
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
High
Normal
Normal
Normal
Normal
Low
High
Normal
Normal
Immediate
Immediate
Immediate

Assignee

Updated

06/23/2022 03:46 PM
06/23/2022 03:58 PM
06/23/2022 03:45 PM
06/23/2022 03:45 PM
06/23/2022 03:45 PM
06/23/2022 03:58 PM
06/23/2022 03:45 PM
06/23/2022 03:45 PM
06/23/2022 03:45 PM
06/23/2022 03:50 PM
06/29/2022 02:07 AM
06/23/2022 03:44 PM
06/23/2022 03:44 PM
06/23/2022 03:51 PM
06/23/2022 04:06 PM
06/23/2022 04:06 PM
06/23/2022 03:44 PM
06/23/2022 04:06 PM
06/23/2022 04:06 PM
06/29/2022 02:09 AM
06/23/2022 04:06 PM
06/23/2022 04:13 PM
06/23/2022 04:14 PM
06/23/2022 04:14 PM
06/23/2022 04:15 PM
06/23/2022 04:16 PM
06/23/2022 04:16 PM
06/23/2022 03:50 PM
06/23/2022 03:53 PM
06/23/2022 03:53 PM
06/23/2022 03:54 PM
06/23/2022 03:54 PM
08/19/2020 03:25 PM
06/23/2022 03:54 PM
06/23/2022 04:06 PM
06/23/2022 04:07 PM
06/23/2022 04:07 PM
06/23/2022 04:10 PM
06/23/2022 03:25 PM
06/23/2022 03:43 PM
06/23/2022 04:10 PM
06/23/2022 03:26 PM
06/23/2022 03:26 PM
01/05/2022 10:57 AM
06/23/2022 03:42 PM
06/23/2022 03:43 PM
06/23/2022 03:43 PM
06/23/2022 04:10 PM
06/27/2022 12:40 AM
06/29/2022 02:07 AM
06/23/2022 04:29 PM
08/01/2017 09:41 AM
09/21/2017 02:50 PM
09/21/2017 02:57 PM
08/01/2017 09:45 AM
08/01/2017 09:45 AM
08/01/2017 09:53 AM
09/21/2017 02:54 PM
09/21/2017 02:54 PM
09/21/2017 02:54 PM
09/21/2017 02:54 PM
06/12/2018 04:27 PM
05/28/2021 06:57 AM
05/28/2021 06:57 AM
05/28/2021 06:58 AM
05/28/2021 06:59 AM
05/28/2021 06:59 AM
06/01/2021 07:07 PM
06/02/2021 12:18 PM
06/02/2021 12:46 PM
06/02/2021 12:46 PM
06/02/2021 12:46 PM
06/02/2021 12:47 PM
06/02/2021 12:47 PM
03/17/2023 04:31 AM
03/14/2023 06:49 PM
06/02/2021 12:34 PM
06/02/2021 12:35 PM
06/02/2021 12:35 PM
06/02/2021 12:35 PM
06/02/2021 12:36 PM
06/02/2021 12:37 PM
06/02/2021 12:13 PM
06/02/2021 12:13 PM
06/02/2021 12:13 PM
06/02/2021 12:13 PM
06/02/2021 12:14 PM
06/02/2021 12:14 PM
06/02/2021 12:14 PM
09/26/2023 11:12 AM
07/01/2023 03:48 PM
09/26/2023 11:12 AM
02/20/2024 09:17 AM
03/07/2023 02:46 PM
03/07/2023 02:31 PM
03/07/2023 02:51 PM
09/08/2023 09:56 AM
09/08/2023 09:58 AM
11/20/2023 01:44 PM
04/20/2023 03:01 PM
06/01/2022 06:33 AM
06/01/2022 06:35 AM
06/01/2022 06:36 AM
06/01/2022 06:36 AM
06/01/2022 06:10 AM
06/01/2022 06:14 AM
06/01/2022 06:14 AM
06/01/2022 06:05 AM
06/01/2022 06:05 AM
06/01/2022 06:05 AM
06/01/2022 05:59 AM
06/01/2022 05:59 AM
06/01/2022 06:31 AM
06/01/2022 06:31 AM
02/28/2024 04:30 PM
03/25/2024 11:20 AM
02/05/2024 11:14 AM
03/25/2024 11:17 AM
03/18/2024 11:17 AM
03/04/2024 11:03 AM
03/04/2024 11:03 AM
03/04/2024 11:13 AM
03/15/2024 09:22 AM
03/25/2024 11:18 AM
03/25/2024 11:18 AM
03/25/2024 11:19 AM
02/21/2024 10:11 AM
02/21/2024 10:11 AM
03/06/2024 10:34 AM
03/06/2024 10:35 AM
03/06/2024 10:43 AM
02/19/2024 07:59 AM
03/25/2024 11:02 AM
03/04/2024 11:09 AM
03/18/2024 11:24 AM
03/25/2024 11:13 AM
03/25/2024 11:13 AM
03/18/2024 11:22 AM
07/15/2021 08:44 PM
07/21/2018 03:17 PM
09/18/2020 09:44 AM
09/11/2020 10:21 AM
09/11/2020 10:21 AM
09/11/2020 10:56 AM
07/15/2021 08:50 PM
10/23/2020 10:24 AM
10/23/2020 10:24 AM
09/11/2020 10:44 AM
09/11/2020 10:44 AM
09/11/2020 10:45 AM
09/18/2020 09:44 AM
09/18/2020 11:20 AM
03/29/2021 07:53 PM
03/29/2021 04:16 PM
09/11/2020 11:31 AM
05/27/2021 01:42 PM
07/15/2021 08:50 PM
09/11/2020 10:35 AM
09/11/2020 10:36 AM
10/23/2020 10:29 AM
06/02/2021 12:12 PM
01/09/2019 12:14 PM
10/11/2022 02:41 PM
03/14/2018 03:59 PM
01/24/2018 04:52 PM
04/05/2018 12:04 PM
01/11/2018 11:15 AM
04/05/2018 12:04 PM
03/09/2018 04:22 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 05:01 PM
05/19/2017 04:47 PM
09/28/2017 11:29 PM
01/24/2018 04:54 PM
01/24/2018 04:53 PM
11/28/2017 12:32 PM
01/24/2018 04:53 PM
01/24/2018 04:54 PM
01/25/2018 02:16 PM
06/17/2018 12:03 PM
01/09/2019 11:28 AM
01/24/2018 04:55 PM
11/28/2017 12:26 PM
11/28/2017 12:26 PM
11/28/2017 12:26 PM
11/28/2017 12:26 PM
11/28/2017 12:26 PM
11/28/2017 12:26 PM
01/24/2018 04:55 PM
11/28/2017 12:26 PM
11/28/2017 12:36 PM
11/28/2017 12:35 PM
11/28/2017 12:35 PM
11/28/2017 12:35 PM
11/28/2017 12:35 PM
01/08/2018 04:09 PM
11/28/2017 12:36 PM
11/28/2017 12:35 PM
11/28/2017 12:35 PM
04/19/2018 11:20 PM
11/28/2017 12:28 PM
04/19/2018 11:20 PM
11/28/2017 12:28 PM
11/28/2017 12:28 PM
05/08/2018 11:55 AM
02/10/2020 05:00 PM
08/09/2018 02:58 PM
03/07/2018 10:26 PM
05/19/2017 05:01 PM
02/23/2018 01:52 PM
10/29/2018 11:46 AM
12/13/2018 12:56 PM
01/22/2019 06:58 PM
04/22/2024 09:57 AM
04/15/2024 02:30 PM
04/15/2024 02:30 PM
04/15/2024 02:30 PM
04/22/2024 09:57 AM
04/22/2024 09:57 AM
04/15/2024 02:51 PM
04/15/2024 02:51 PM
04/15/2024 02:51 PM
04/15/2024 02:56 PM
04/15/2024 02:54 PM
04/15/2024 02:55 PM
04/15/2024 04:40 PM
04/15/2024 04:41 PM
04/15/2024 05:09 PM
04/15/2024 05:13 PM
04/15/2024 05:13 PM
04/15/2024 05:19 PM
04/15/2024 05:48 PM
11/06/2023 01:46 PM
11/20/2023 01:53 PM
11/06/2023 01:55 PM
08/16/2019 04:19 PM
09/16/2019 12:21 PM
09/16/2019 12:21 PM
12/07/2018 08:52 AM
12/07/2018 08:43 AM
12/07/2018 08:43 AM
12/07/2018 08:49 AM
12/07/2018 08:45 AM
12/07/2018 08:47 AM
12/07/2018 08:56 AM
09/16/2019 12:22 PM
09/16/2019 11:52 AM
10/03/2019 11:20 AM
08/18/2019 01:09 AM
08/28/2019 12:17 PM
08/21/2019 10:44 AM
08/21/2019 10:45 AM
09/23/2019 11:03 AM
09/04/2019 11:50 AM
08/21/2019 10:55 AM
10/03/2019 11:20 AM
10/03/2019 11:21 AM
10/03/2019 11:24 AM
10/16/2019 10:40 AM
10/12/2023 10:26 AM
01/29/2024 09:58 AM
03/25/2024 10:12 AM
10/30/2023 10:46 AM
11/09/2023 09:22 AM
11/20/2023 10:48 AM
02/01/2024 10:15 AM
12/06/2023 02:12 PM
02/08/2024 09:57 AM
02/08/2024 10:08 AM
02/05/2024 10:13 AM
02/12/2024 10:03 AM
03/25/2024 10:31 AM
02/12/2024 10:03 AM
02/15/2024 10:44 AM
04/25/2024 10:30 AM
04/11/2024 10:19 AM
03/25/2024 10:32 AM
04/22/2024 10:07 AM
04/22/2024 10:23 AM
04/22/2024 10:25 AM
04/25/2024 10:18 AM
04/25/2024 10:35 AM
01/29/2024 09:59 AM
02/08/2024 09:59 AM
03/21/2024 10:40 AM
02/05/2024 09:50 AM
03/04/2024 08:36 PM
03/18/2024 10:41 AM
01/29/2024 10:12 AM
04/18/2024 11:24 AM
11/27/2023 12:46 PM
04/22/2024 11:05 AM
09/18/2023 10:02 AM
03/11/2024 10:43 AM
12/18/2023 11:33 AM
11/27/2023 12:39 PM
11/27/2023 12:36 PM
02/01/2024 10:26 AM
11/27/2023 12:52 PM
08/14/2023 04:41 PM
11/27/2023 12:20 PM
11/27/2023 12:31 PM
11/09/2023 10:37 AM
01/29/2024 10:32 AM
01/29/2024 10:31 AM
01/29/2024 10:31 AM
12/18/2023 11:30 AM
02/15/2024 10:34 AM
02/05/2024 08:38 AM
02/22/2024 04:30 AM
02/05/2024 10:20 AM
02/05/2024 10:19 AM
02/26/2024 10:40 AM
03/07/2024 10:32 AM
03/07/2024 11:23 AM
04/25/2024 04:08 AM
03/25/2024 10:09 AM
03/25/2024 10:09 AM
03/29/2024 11:37 AM
12/01/2023 11:02 AM
04/10/2024 06:18 AM
03/07/2024 11:27 AM
05/25/2018 03:02 PM
03/01/2018 06:39 PM
03/01/2018 07:03 PM
03/01/2018 06:15 PM
05/25/2018 02:59 PM
05/25/2018 02:59 PM
03/01/2018 07:03 PM
03/01/2018 06:24 PM
05/25/2018 02:58 PM
03/01/2018 08:33 PM
03/01/2018 08:33 PM
05/25/2018 02:58 PM
03/01/2018 06:35 PM
03/01/2018 06:36 PM
05/25/2018 02:55 PM
05/25/2018 02:55 PM
03/01/2018 06:32 PM
03/01/2018 06:38 PM
03/01/2018 07:03 PM
03/01/2018 06:19 PM
03/01/2018 06:37 PM
03/01/2018 07:03 PM
03/01/2018 06:27 PM
05/25/2018 03:02 PM
05/25/2018 03:02 PM
05/25/2018 03:02 PM
05/25/2018 03:00 PM
05/25/2018 02:59 PM
05/25/2018 02:59 PM
03/18/2018 11:55 AM
03/18/2018 11:55 AM
05/25/2018 02:57 PM
03/01/2018 06:49 PM
05/25/2018 02:57 PM
03/01/2018 06:50 PM
05/25/2018 03:00 PM
05/25/2018 03:00 PM
05/25/2018 02:56 PM
03/18/2018 11:56 AM
03/01/2018 06:43 PM
03/01/2018 07:08 PM
03/01/2018 06:56 PM
03/01/2018 06:50 PM
03/01/2018 07:02 PM
03/01/2018 06:56 PM
03/01/2018 07:08 PM
03/01/2018 06:51 PM
03/01/2018 07:02 PM
03/01/2018 07:08 PM
03/01/2018 07:08 PM
03/01/2018 07:08 PM
03/01/2018 07:08 PM
03/01/2018 06:59 PM
03/01/2018 07:08 PM
03/01/2018 06:10 PM
03/01/2018 06:10 PM
03/01/2018 06:10 PM
05/30/2017 04:59 PM
05/30/2017 10:50 AM
06/09/2017 10:30 AM
07/31/2017 10:38 AM
07/27/2017 05:48 PM
07/27/2017 05:35 PM
07/26/2017 06:29 PM
07/26/2017 06:29 PM
07/27/2017 05:33 PM
07/27/2017 05:33 PM
07/27/2017 05:26 PM
07/31/2017 10:38 AM
07/27/2017 05:34 PM
07/27/2017 05:35 PM
07/27/2017 05:48 PM
07/27/2017 05:49 PM
03/01/2018 05:45 PM
10/25/2019 09:51 AM
07/19/2018 11:22 AM
05/30/2017 10:40 AM
02/21/2018 04:14 PM
10/25/2019 09:51 AM
02/21/2018 04:11 PM
10/25/2019 09:45 AM
10/25/2019 09:51 AM
02/21/2018 04:13 PM
02/21/2018 04:13 PM
10/25/2019 09:44 AM
02/21/2018 04:12 PM
05/30/2017 10:32 AM
05/30/2017 10:33 AM
05/30/2017 10:33 AM
03/01/2018 05:45 PM
02/21/2018 04:12 PM
05/30/2017 10:34 AM
05/30/2017 10:34 AM
05/30/2017 10:07 AM
05/30/2017 10:08 AM
05/30/2017 10:08 AM
11/07/2019 05:41 PM
04/06/2020 11:27 AM
01/08/2020 05:53 PM
11/15/2019 10:37 AM
12/03/2019 04:41 PM
04/06/2020 11:27 AM
11/22/2019 10:37 AM
04/02/2020 07:36 AM
12/03/2019 04:40 PM
12/03/2019 04:41 PM
11/06/2020 02:16 PM
09/18/2020 12:55 PM
11/06/2020 02:16 PM
 
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Kaon_LT Experiment
In Progress 98%
In Progress 90%
In Progress 35%
In Progress 20%
In Progress 0%
In Progress 0%
In Progress 0%
In Progress 0%
In Progress 40%
In Progress 30%
New 0%
New 0%
New 0%
New 0%
New 0%
In Progress 70%
In Progress 0%
In Progress 50%
In Progress 30%
In Progress 70%
New 0%
In Progress 33%
Resolved 100%
In Progress 0%
New 0%
New 0%
New 0%
Resolved 100%
In Progress 0%
In Progress 0%
New 10%
In Progress 0%
Compton simulation
New 0%
New 0%
New 80%
SBS-analysis
In Progress 90%
BBCal_calibration
Feedback 100%
SBS-GEn-GEM
New 0%
New 0%
SBS-DAQ-Gmn-BigBite
New 0%
Hall A Analyzer
Hall A Analyzer -1.6 89%
In Progress 86%
In Progress 50%
In Progress 83%
In Progress 80%
In Progress 90%
In Progress 50%
Hall A Analyzer -1.7 28%
New 0%
New 10%
New 20%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
In Progress 10%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 44%
New 0%
New 0%
In Progress 80%
In Progress 20%
In Progress 80%
New 0%
In Progress 70%
New 0%
New 25%
New 0%
In Progress 50%
New 0%
In Progress 10%
In Progress 100%
Feedback 100%
New 100%
New 0%
Hall A Analyzer -2.0 10%
In Progress 10%
In Progress 10%
 
 
LAD experiment
 
 
 
In Progress 72%
Task #997: Hodoscope Work at ESB

Project: LAD experiment
Status: In Progress
Start date: 01/08/2024
Due date: 04/26/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
Resolved 100%
Resolved 100%
Resolved 100%
 
 
 
 
 
In Progress 45%
Task #1000: ASSY 6

Project: LAD experiment
Status: In Progress
Start date: 04/08/2024
Due date: 04/26/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
 
 
 
In Progress 90%
Task #1002: ASSY 6 Optic Fibers

Project: LAD experiment
Status: In Progress
Start date: 04/08/2024
Due date: 04/26/2024
Assignee: Florian Hauenstein
Priority: Normal
 
 
New 80%
Task #1008: Add LAD geometry in simulation

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 05/31/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
 
 
New 70%
Task #1009: Add GEM materials in simulation

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 05/31/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
 
 
New 0%
Task #1010: Simulation: LAD digitization

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 05/31/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
 
 
New 0%
Task #1011: Simulation: GEM digitization

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 05/31/2024
Assignee: Carlos Ayerbe Gayoso
Priority: Normal
 
 
New 0%
Task #1012: Reconstruction: LAD hits

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 06/30/2024
Assignee:
Priority: Normal
 
 
New 0%
Task #1013: Reconstruction: Combine GEM track and LAD hit

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 06/12/2024
Assignee:
Priority: Normal
 
 
New 0%
Task #1014: LAD event display/monitoring plots

Project: LAD experiment
Status: New
Start date: 04/15/2024
Due date: 07/17/2024
Assignee:
Priority: Normal
GFF Partons
In Progress 0%
In Progress 0%
Measurement of the Generalized Polarizabilities of the Proton in Virtual Compton Scattering E12-15-001
Resolved 0%
Resolved 0%
Resolved 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
Resolved 0%
NPS
In Progress 0%
NPS software
In Progress 20%
Resolved 0%
In Progress 0%
In Progress 0%
NPS analysis
New 60%
PREX/CREX
New 41%
New 50%
Resolved 100%
New 0%
New 33%
New 100%
New 0%
New 0%
New 58%
Resolved 100%
Resolved 50%
In Progress 80%
New 0%
Resolved 0%
In Progress 50%
In Progress 100%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 100%
New 100%
New 100%
New 40%
New 43%
In Progress 100%
New 30%
New 0%
New 50%
Resolved 100%
New 50%
New 0%
New 40%
In Progress 100%
New 20%
New 0%
New 39%
New 23%
In Progress 70%
New 0%
New 0%
New 50%
Resolved 100%
Resolved 100%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
New 0%
SBS Software
Resolved 100%
Resolved 100%
Resolved 100%
In Progress 85%
Resolved 100%
Resolved 100%
Resolved 30%
In Progress 30%
Resolved 100%
Resolved 100%
Resolved 100%
Resolved 100%
In Progress 70%
In Progress 70%
In Progress 80%
Resolved 100%
In Progress 70%
In Progress 52%
In Progress 80%
New 0%
New 70%
In Progress 53%
New 80%
New 80%
New 11%
New 0%
New 0%
New 0%
New 50%
New 30%
New 0%
New 0%
New 0%
New 0%
New 0%
New 10%
 

Also available in: PDF PNG