Actions
  2019 Run Plans and Run Sheets » History » Revision 28
      « Previous |
    Revision 28/37
      (diff)
      | Next »
    
    Vijay Kumar, 07/19/2019 04:41 AM 
    
    
Run Plans and Run Sheets¶
Summer 2019 Run Period¶
- Blank Run Sheets
	
- New Configuration Sheet runsheet_pion.tgif.pdf
 - Continuing Configuration Sheet runsheet2_pion.tgif.pdf
 
 
- Run Plans
	
- Run Plan Spread Sheet pion_lowEkin_runplan.ods
 - Run Plan runplan_lowQ2.pdf
 - SIMC Plots (low Q2 Fpi) tphi_lowQ2.pdf
 - Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf
 
 
- Run List
	
- Runlist CSV file pion_runlist_summer19.csv
 - Standard kinematics
 
 
- Run Sheets
	
- 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) optics_2p7gev.pdf
 - 2.7 GeV Run Sheets runsheets_2p7gev.pdf
 - 3.6 GeV Run Sheets runsheets_3p6gev.pdf
 - 4.5 GeV Run Sheets runsheets_4p5gev.pdf
 
 
Later high energy running¶
- Beam pipe requirements beampipe_req.pdf
 
Updated by Vijay Kumar over 6 years ago · 28 revisions