Task #1154: Drift chamber commissioning with cosmic ray ESB
Task #1155: Hodoscope commissioning with cosmic ray in ESB
Bug #1088: Makeing Additional MPPC Boxes
Task #1089: HV Operation Test
Task #1119: ASD Card Power Connector
Task #1129: Wire Repair
Task #1120: Hodoscope Spare
Task #1123: Connector Reinforce
Task #1156: HES HODO frame parts are missed
Task #1157: HES HODO Repairment : PMT-Light Guide-Paddle connection
Task #1158: Paddle end is fogged
Task #1159: Soft Black Sheet
Task #1160: HES HODO's cables (HV & Signal) repariment
Task #1161: HES HODO Frame broken - wood branch supports top side
Task #1116: VTP Works
Task #1117: VTP trigger debug
Task #1118: Manual
Task #1121: Hodoscope Spare
Task #1162: HKS HODO Signal Check
Task #1163: HKS HODO noise chcek
Task #1164: HKS HODO noise chcek
Task #1165: Where is KTOF2Y
Task #1092: WC Shipping
Task #1093: WC test by cosmic in JLab
Idea #1124: Optical Grease
Bug #1125: failure for setting OPE trigger
Bug #1128: Failure measurement
Idea #1126: Macros for WC
Task #1127: Small NPE
Bug #1130: Water Leakage
Task #1248: TOSCA Calculation
Task #1249: TOSCA Modeller Preparation
Task #1250: TOSCA Post-Processor Calculation
Task #1251: TOSCA Map Registration
Task #1269: HKS-HES simulator development
Task #1273: DetectorConstruction Development
Task #1274: ROOT output modification
Task #1275: ParticleGenerator Update
Task #1270: ENGE simulator development
Task #1276: DetectorConstruction Development
Task #1277: ROOT output modification
Task #1278: ParticleGenerator update
Task #1271: G4 radiation simulator development
Task #1279: Geometry Update
Task #1280: Beam Tracking
Task #1281: Detector installation
Task #1272: FLUKA radiation simulator development
Task #1282: Geometry update
Task #1283: Boundary dose estimation
Task #1284: Residual dose estimation
Task #1191: Hypernuclear analyzer
Task #1192: Update DC
Task #1193: Add vfTDC decoder
Task #1194: Subdector classes and reconstructed data objects
Task #1195: Check ESB cosmic data
Task #1196: Review/Update DB parameters
Task #1197: Code clean up
Feature #1219: Check/Generalize the tracking for single chamber
Task #1198: Update Cherenkov
Task #1199: Add base class
Task #1200: Work coarse processing
Task #1201: Add track matching
Task #1202: Update TOF
Task #1203: Decoding
Task #1204: Reconstruction (CoarseProcessing)
Task #1205: Review/Update DB parameters
Task #1206: Spectrometer
Task #1207: Add/verify target quantity calculations
Task #1215: Add new spectrometer class
Task #1208: Add BPM detector
Feature #1209: Using simulation for replay
Feature #1210: Add simulation interface
Feature #1211: Add digitization for new TDC modules?
Feature #1212: Redefine simulation input data structure
Support #1213: Test with simulation files
Support #1214: Documentation
Task #1217: Add Sci Fiber detector
Task #1218: Kinematic reconstruction modules
Task #1220: Updated singles rates for detectors
Task #1222: PiFi TestBench
Task #1223: SciFi Assembly
Task #1225: NINO Card Operation Check
Task #1252: Performance Check with beta rays
Task #1224: Evaluation at J-PARC K1.8BR
Task #1254: Performance Check with Cosmic-rays
Task #1253: Additional Check with KEK AR or RARiS (if needed)
Task #1229: PiFi Construction
Task #1111: Vacuum Port
Task #1226: Vacuum Port Design
Task #1227: Vacuum Port Fabrication
Task #1228: Clear Fiber Cut
Task #1256: Clear Fiber Assembling
Task #1230: OLS Fiber
Task #1231: OLS Fiber Jig Design
Task #1232: OLS Fiber Fabrication
Task #1233: OLS Fiber Assembling
Task #1234: OLS Fiber Polishing
Task #1257: OLS Fiber, Flange Assembling
Task #1259: Vacuum Check
Task #1261: MAPMT Assembling
Task #1263: Operation Check
Task #1260: MAPMT Delivery
Task #1262: NINO Card Check
Task #1258: Shipping
Task #1264: X Layer Re-assembling
Task #1265: Y Layer Fabrication
Task #1266: Y Layer Shipping
Task #1267: PMT Gain Adjustment
Task #1268: Performance check with cosmic rays

Status

New
New
In Progress
New
New
Feedback
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
Resolved
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
Resolved
Resolved
In Progress
In Progress
In Progress
Resolved
In Progress
Resolved
Resolved
New
In Progress
Resolved
In Progress
New
In Progress
In Progress
Resolved
Resolved
In Progress
Resolved
New
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New

Priority

Normal
Normal
Normal
High
Normal
Urgent
Normal
Normal
Normal
Normal
Normal
Low
Normal
Normal
Normal
Normal
Normal
Low
Normal
Normal
Normal
Low
Normal
Normal
Low
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Low
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal

Updated

01/27/2026 04:20 PM
01/27/2026 04:22 PM
05/22/2025 02:39 PM
06/18/2025 09:56 PM
06/18/2025 09:58 PM
09/03/2025 11:57 AM
07/07/2025 10:23 PM
01/29/2026 11:44 AM
01/29/2026 11:16 AM
01/29/2026 11:41 AM
02/05/2026 11:12 AM
01/29/2026 12:02 PM
02/05/2026 11:10 AM
02/05/2026 11:09 AM
06/18/2025 03:27 AM
06/18/2025 03:28 AM
06/18/2025 03:30 AM
07/29/2025 04:56 PM
02/05/2026 07:15 PM
02/05/2026 07:15 PM
01/30/2026 09:49 PM
02/05/2026 11:08 AM
08/20/2025 09:43 AM
08/20/2025 09:46 AM
08/20/2025 09:53 AM
08/21/2025 10:17 AM
08/25/2025 12:54 AM
08/25/2025 12:50 AM
08/25/2025 12:51 AM
08/31/2025 12:46 AM
06/05/2026 01:54 PM
06/05/2026 01:54 PM
06/08/2026 11:26 AM
06/08/2026 11:26 AM
06/08/2026 11:24 AM
06/08/2026 11:25 AM
06/08/2026 11:24 AM
06/08/2026 11:25 AM
06/08/2026 11:28 AM
06/08/2026 11:27 AM
06/08/2026 11:28 AM
06/08/2026 11:28 AM
06/08/2026 11:30 AM
06/08/2026 11:30 AM
06/08/2026 11:30 AM
06/08/2026 11:31 AM
06/08/2026 11:32 AM
06/08/2026 11:31 AM
06/08/2026 11:32 AM
06/08/2026 11:32 AM
05/19/2026 09:04 AM
05/19/2026 09:04 AM
02/12/2026 09:35 AM
02/12/2026 09:37 AM
02/12/2026 09:35 AM
02/12/2026 09:36 AM
02/12/2026 09:37 AM
05/19/2026 09:04 AM
02/19/2026 11:01 AM
02/12/2026 09:40 AM
02/19/2026 11:01 AM
02/12/2026 09:41 AM
03/26/2026 09:01 AM
02/12/2026 09:43 AM
02/12/2026 09:44 AM
02/12/2026 09:44 AM
02/12/2026 09:56 AM
02/12/2026 09:46 AM
02/12/2026 10:17 AM
02/12/2026 09:47 AM
02/12/2026 10:17 AM
02/12/2026 10:17 AM
02/12/2026 09:50 AM
02/12/2026 11:47 AM
02/12/2026 09:53 AM
02/12/2026 09:54 AM
02/12/2026 03:21 PM
02/12/2026 03:21 PM
02/16/2026 11:14 AM
05/26/2026 08:49 AM
05/20/2026 11:09 PM
05/20/2026 11:08 PM
05/20/2026 11:10 PM
05/20/2026 11:11 PM
05/26/2026 08:49 AM
05/20/2026 11:13 PM
05/26/2026 09:42 AM
05/26/2026 09:23 AM
05/26/2026 08:53 AM
05/26/2026 09:25 AM
05/26/2026 08:56 AM
05/26/2026 09:23 AM
05/26/2026 09:32 AM
05/26/2026 09:29 AM
05/26/2026 09:31 AM
05/26/2026 09:30 AM
05/26/2026 09:32 AM
05/26/2026 09:45 AM
05/26/2026 09:36 AM
05/26/2026 09:39 AM
05/26/2026 09:42 AM
05/26/2026 09:44 AM
05/26/2026 09:44 AM
05/26/2026 09:45 AM
06/08/2026 01:53 PM
06/08/2026 03:25 PM
05/26/2026 10:05 AM
05/26/2026 10:10 AM
06/08/2026 01:31 PM
 
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Enge SiPM test
In Progress 50%
HKS WC
New 30%
New 30%
 
HYP Simulation
 
 
 
New 0%
Task #1248: TOSCA Calculation

Project: HYP Simulation
Status: New
Start date: 05/17/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1249: TOSCA Modeller Preparation

Project: HYP Simulation
Status: New
Start date: 05/17/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1250: TOSCA Post-Processor Calculation

Project: HYP Simulation
Status: New
Start date: 06/01/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1251: TOSCA Map Registration

Project: HYP Simulation
Status: New
Start date: 06/14/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
 
 
New 0%
Task #1269: HKS-HES simulator development

Project: HYP Simulation
Status: New
Start date: 06/05/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
New 0%
Task #1273: DetectorConstruction Development

Project: HYP Simulation
Status: New
Start date: 06/05/2026
Due date: 12/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1274: ROOT output modification

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
New 0%
Task #1275: ParticleGenerator Update

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
 
New 0%
Task #1270: ENGE simulator development

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
New 0%
Task #1276: DetectorConstruction Development

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 12/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1277: ROOT output modification

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
New 0%
Task #1278: ParticleGenerator update

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 03/31/2027
Assignee:
Priority: Normal
 
 
 
 
New 0%
Task #1271: G4 radiation simulator development

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1279: Geometry Update

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1280: Beam Tracking

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1281: Detector installation

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
 
 
 
New 0%
Task #1272: FLUKA radiation simulator development

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1282: Geometry update

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1283: Boundary dose estimation

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1284: Residual dose estimation

Project: HYP Simulation
Status: New
Start date: 06/08/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
PiFi
 
 
 
New 33%
Task #1222: PiFi TestBench

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 09/30/2026
Assignee: Jin Takahashi
Priority: Normal
New 100%
New 100%
New 0%
 
 
New 0%
Task #1224: Evaluation at J-PARC K1.8BR

Project: PiFi
Status: New
Start date: 06/01/2026
Due date: 06/12/2026
Assignee: Jin Takahashi
Priority: Normal
 
New 0%
Task #1254: Performance Check with Cosmic-rays

Project: PiFi
Status: New
Start date: 06/22/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1253: Additional Check with KEK AR or RARiS (if needed)

Project: PiFi
Status: New
Start date: 07/01/2026
Due date: 09/30/2026
Assignee:
Priority: Low
 
 
New 0%
Task #1229: PiFi Construction

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 03/31/2027
Assignee: Jin Takahashi
Priority: Normal
 
 
 
New 0%
Task #1111: Vacuum Port

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 08/31/2026
Assignee: Sho Nagao
Priority: Normal
 
 
New 0%
Task #1226: Vacuum Port Design

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 06/12/2026
Assignee:
Priority: Normal
 
New 0%
Task #1227: Vacuum Port Fabrication

Project: PiFi
Status: New
Start date: 06/15/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1228: Clear Fiber Cut

Project: PiFi
Status: New
Start date: 06/19/2026
Due date: 07/31/2026
Assignee: Sho Nagao
Priority: Normal
 
New 0%
Task #1256: Clear Fiber Assembling

Project: PiFi
Status: New
Start date: 08/01/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
 
 
New 0%
Task #1230: OLS Fiber

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 09/18/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1231: OLS Fiber Jig Design

Project: PiFi
Status: New
Start date: 03/05/2026
Due date: 06/19/2026
Assignee:
Priority: Normal
 
New 0%
Task #1232: OLS Fiber Fabrication

Project: PiFi
Status: New
Start date: 06/22/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1233: OLS Fiber Assembling

Project: PiFi
Status: New
Start date: 08/01/2026
Due date: 08/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1234: OLS Fiber Polishing

Project: PiFi
Status: New
Start date: 09/01/2026
Due date: 09/18/2026
Assignee:
Priority: Normal
 
New 0%
Task #1257: OLS Fiber, Flange Assembling

Project: PiFi
Status: New
Start date: 09/21/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
New 0%
New 0%
New 0%
 
 
New 0%
Task #1260: MAPMT Delivery

Project: PiFi
Status: New
Start date: 06/01/2026
Due date: 12/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1262: NINO Card Check

Project: PiFi
Status: New
Start date: 06/01/2026
Due date: 11/30/2026
Assignee:
Priority: Normal
 
New 0%
Task #1258: Shipping

Project: PiFi
Status: New
Start date: 10/01/2026
Due date: 11/30/2026
Assignee:
Priority: Normal
 
 
 
PiTOF
 
 
New 0%
Task #1264: X Layer Re-assembling

Project: PiTOF
Status: New
Start date: 06/01/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
 
New 0%
Task #1265: Y Layer Fabrication

Project: PiTOF
Status: New
Start date: 06/01/2026
Due date: 07/31/2026
Assignee:
Priority: Normal
 
New 0%
Task #1266: Y Layer Shipping

Project: PiTOF
Status: New
Start date: 08/01/2026
Due date: 08/14/2026
Assignee:
Priority: Normal
 
New 0%
Task #1267: PMT Gain Adjustment

Project: PiTOF
Status: New
Start date: 08/01/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 
New 0%
Task #1268: Performance check with cosmic rays

Project: PiTOF
Status: New
Start date: 08/01/2026
Due date: 09/30/2026
Assignee:
Priority: Normal
 