Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
515 Kaon_LT Experiment Task Resolved Normal CPU and electronic live time 06/29/2022 02:09 AM Actions
513 Kaon_LT Experiment Task Resolved Normal Trigger efficiency 06/23/2022 03:44 PM Actions
512 Kaon_LT Experiment Task Resolved Normal Tracking efficiency 06/23/2022 03:44 PM Actions
491 Measurement of the Generalized Polarizabilities of the Proton in Virtual Compton Scattering E12-15-001 Task Resolved Normal Runlist / data quality Ruonan Li 09/23/2019 11:03 AM Actions
483 Kaon_LT Experiment Task Resolved Normal Hodoscope Stephen Kay 06/23/2022 03:45 PM Actions
482 Kaon_LT Experiment Task Resolved Normal SHMS DC Richard Trotta 06/23/2022 03:45 PM Actions
481 Kaon_LT Experiment Task Resolved Normal HMS DC Stephen Kay 06/23/2022 03:45 PM Actions
479 Kaon_LT Experiment Task Resolved Normal HG Cherenkov Vijay Kumar 06/23/2022 03:45 PM Actions
478 Kaon_LT Experiment Task Resolved Normal Aerogel Vladimir Berdnikov 06/23/2022 03:45 PM Actions
477 Kaon_LT Experiment Task Resolved Normal Calorimeter Richard Trotta 06/23/2022 03:45 PM Actions
474 Kaon_LT Experiment Task Resolved Normal SHMS_Aerogel gain stability (Calibration) Vladimir Berdnikov 06/23/2022 03:46 PM Actions
441 Measurement of the Generalized Polarizabilities of the Proton in Virtual Compton Scattering E12-15-001 Task Resolved Normal Create shift sign-up page 09/16/2019 12:22 PM Actions
431 Measurement of the Generalized Polarizabilities of the Proton in Virtual Compton Scattering E12-15-001 Task Resolved Normal Develop Run plan Hamza Atac 08/16/2019 04:19 PM Actions
327 PREX/CREX Task Resolved Normal Vacuum Transport Engineering Robin Wines 03/01/2018 07:02 PM Actions
326 PREX/CREX Task Resolved Normal Vacuum Through Septum Calculation 03/01/2018 06:51 PM Actions
320 PREX/CREX Task Resolved Normal Target Shielding Calculation 03/01/2018 06:49 PM Actions
313 PREX/CREX Task Resolved Normal Collimator to Fabrication 03/01/2018 08:33 PM Actions
312 PREX/CREX Task Resolved Normal Collimator Design 03/01/2018 08:33 PM Actions
301 PREX/CREX Task Resolved Normal Q1 Hard Water Connections 03/01/2018 06:36 PM Actions
280 PREX/CREX Task Resolved Normal Septum Coil Engineering Robin Wines 03/01/2018 07:03 PM Actions
708 BBCal_calibration Bug Feedback Normal Look at the correlation of BBCal signal ADC time with BBCal trigger TDC time (readout by 1190) Provakar Datta 03/07/2023 02:51 PM Actions
707 BBCal_calibration Bug Feedback Normal Look at the ADC time distributions of BBCal trigger sums Provakar Datta 03/07/2023 02:31 PM Actions
350 Hall A Analyzer Feature Feedback Normal BankData class and support in decoder Robert Michaels 02/10/2020 05:00 PM Actions
898 BBCal_calibration Task Feedback Normal BBCAL calibration QA using sbs8 pass2_QA data Provakar Datta 11/20/2023 01:44 PM Actions
812 BBCal_calibration Task Feedback Normal BBCAL Energy Calibration for Pass 2 Provakar Datta 09/08/2023 09:58 AM Actions
(526-550/561) Per page: 25, 50, 100

Also available in: Atom CSV PDF