Project

General

Profile

Actions

2021 Run Plans and Run Sheets » History » Revision 12

« Previous | Revision 12/53 (diff) | Next »
Garth Huber, 09/01/2021 04:09 PM


Fall 2021 Run Plans and Run Sheets

  • Run Plan Spread Sheet attachment:pion_loweps_runplan_21aug31.ods

9.2 GeV Beam

  • Run Plan runplan_9p2gev.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_9p2gev_scan.pdf
  • 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods

9.2 GeV Run sheets

  • Heep attachment:heep_9p2.pdf
  • Luminosity scan attachment:lumi_9p2.pdf
  • Physics runs attachment:physics_9p2_loweps.pdf

8.0 GeV Beam (to be posted in October)

  • Run Plan attachment:runplan_8p0gev.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
  • 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods

8.0 GeV Run sheets

  • Heep attachment:heep_8p0.pdf
  • Luminosity scan attachment:lumi_8p0.pdf
  • Physics runs attachment:physics_8p0_loweps.pdf

9.9 GeV Beam (to be posted in October)

  • Run Plan runplan_9p9gev.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_9p9gev_scan.pdf
  • 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods

9.9 GeV Run sheets

  • Heep attachment:heep_9p9.pdf
  • Luminosity scan attachment:lumi_9p9.pdf
  • Physics runs attachment:physics_9p9_loweps.pdf

6.0 GeV Beam (to be posted in October)

  • Run Plan runplan_6p0gev.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_6p0gev_scan.pdf
  • 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
  • Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods

6.0 GeV Run sheets

  • Heep attachment:heep_6p0.pdf
  • Physics runs attachment:physics_6p0_loweps.pdf

Updated by Garth Huber over 2 years ago · 12 revisions