Actions
2021 Run Plans and Run Sheets » History » Revision 49
« Previous |
Revision 49/53
(diff)
| Next »
Nathan Heinrich, 12/21/2021 08:27 AM
Fall 2021 Run Plans and Run Sheets¶
- Blank Run Sheets
- New Configuration Sheet runsheet_pion21.tgif.ps
- Continuing Configuration Sheet runsheet_pion21.tgif.ps
- Run Plan Spread Sheet pion_loweps_runplan_21dec20.ods
- JLab Beam Schedule 20210316_JLab_ExpSch.pdf 20211004_JLab_ExpSch.pdf 20211122_JLab_ExpSch.pdf
- Beam pipe requirements beampipe_req.pdf
- SHMS small angle test 21-Jun-09 angle_test_21jun09.pdf
9.2 GeV Beam¶
- Run Plan runplan_9p2gev.pdf
- Scanned run plan (with shift worker and RC notes) runplan_9p2gev_scan.pdf
- 9.2 GeV Run list runlist_pionLT_2021_Eb_9p173.csv
- 9.2 GeV Run list (formatted) runlist_pionLT_2021_Eb_9p173.ods runlist_pionLT_2021_Eb_9p173.pdf
9.2 GeV Run sheets¶
- Calibrations #1 (Heep-Coin, Sieve1) runsheets_9p2gev_calib1.pdf
- Physics Q2=1.60, W=3.08 runsheets_9p2gev_q21p60_w3p08.pdf
- Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) runsheets_9p2gev_calib2.pdf
- Physics Q2=6.00, W=3.19 LEFT runsheets_9p2gev_q26p00_w3p19_left.pdf
- Physics Q2=6.00, W=3.19 CENTER runsheets_9p2gev_q26p00_w3p19_center.pdf
- Physics Q2=8.50, W=2.79 runsheets_9p2gev_q28p50_w2p79.pdf
6.0 GeV Beam¶
- Run Plan runplan_6p0gev.pdf
- Scanned run plan (with shift worker and RC notes) runplan_6p0gev_scan.pdf
- 6.0 GeV Run list runlist_pionLT_2021_Eb_5p985.csv
- 6.0 GeV Run list (formatted) runlist_pionLT_2021_Eb_5p985.ods runlist_pionLT_2021_Eb_5p985.pdf
6.0 GeV Run sheets runsheets_6p0gev.pdf¶
9.9 GeV Beam¶
- Run Plan runplan_9p9gev.pdf
- Scanned run plan (with shift worker and RC notes) runplan_9p9gev_scan.pdf
- 9.9 GeV Run list runlist_pionLT_2021_Eb_9p876.csv
- 9.9 GeV Run list (formatted) runlist_pionLT_2021_Eb_9p876.ods runlist_pionLT_2021_Eb_9p876.pdf
9.9 GeV Run sheets¶
- Calibrations (Heep-Singles, Coin) runsheets_9p9gev_calib.pdf
- Physics Q2=1.60, W=3.08 runsheets_9p9gev_q21p60_w3p08.pdf
- Physics Q2=3.85, W=3.07 runsheets_9p9gev_q23p85_w3p07.pdf
- Physics Q2=5.00, W=2.95 runsheets_9p9gev_q25p00_w2p95.pdf
- Physics Q2=6.00, W=3.19 runsheets_9p9gev_q26p00_w3p19.pdf
8.0 GeV Beam¶
- Run Plan Part 1 (December) runplan_8p0gev-1.pdf
- Run Plan Part 2 (Jan/Feb) runplan_8p0gev-2.pdf
- Scanned run plan (December) (with shift worker and RC notes) runplan_8p0gev-1_scan.pdf
- Scanned run plan (Jan/Feb) (with shift worker and RC notes) runplan_8p0gev-2_scan.pdf
- Special EDTM study w/ Cosmics Runplan_EDTM_21dec01.pdf
- 8.0 GeV Run list (December) runlist_pionLT_2021_Eb_7p937_Part1.csv
- 8.0 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.csv
- 8.0 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937-1.ods https://redmine.jlab.org/attachments/1363 attachment:runlist_pionLT_2021_Eb_7p937-1.pdf
- 8.0 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.ods attachment:runlist_pionLT_2021_Eb_7p937-2.pdf
8.0 GeV Run sheets¶
- Physics #1 pi- (December) runsheets_8p0gev-1_piminus.pdf
- Calibrations #1 (Heep-Singles, Lumi, EDTM) runsheets_8p0gev_calib1.pdf
- Special EDTM study w/ Cosmics runsheets_EDTM_21dec01.pdf
- Physics #2 pi+ (December) runsheets_8p0gev-2_piplus.pdf
- Physics #3 pi+ (Jan/Feb) attachment:runsheets_8p0gev-3_piplus.pdf
- Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) runsheets_8p0gev_calib2.pdf
- Physics #4 pi- (Feb) runsheets_8p0gev-4_piminus.pdf
Updated by Nathan Heinrich almost 3 years ago · 49 revisions