Project

General

Profile

Actions

2022 Run Plans and Run Sheets » History » Revision 49

« Previous | Revision 49/77 (diff) | Next »
Garth Huber, 08/10/2022 06:22 PM


Summer 2022 Run Plans and Run Sheets

10.6 GeV Beam

10.6 GeV Run sheets

8.5 GeV Beam

  • Run Plan attachment:runplan_8p487GeV_v10.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:
  • 8.5 GeV Run list attachment:
  • 8.5 GeV Run list (formatted) attachment:

8.5 GeV Run sheets

  • Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf
  • Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf
  • Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf
  • Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf
  • Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf

6.4 GeV Beam

  • Run Plan Part 2022Runplan6p4GeV.pdf
  • Scanned run plan (with shift worker and RC notes) runplan_6p4gev_scan.pdf
  • 6.4 GeV Run list attachment:runlist_pionLT_2021_Eb_6p4.csv
  • 6.4 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_6p4.ods attachment:runlist_pionLT_2021_Eb_6p4.pdf

6.4 GeV Run sheets

  • Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf
  • Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf
  • Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf
  • Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf
  • Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf
  • Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf
  • Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf
  • Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf

Updated by Garth Huber over 2 years ago · 49 revisions