Project

General

Profile

Actions

2022 Run Plans and Run Sheets » History » Revision 5

« Previous | Revision 5/77 (diff) | Next »
Jacob Murphy, 05/28/2022 05:41 PM


Summer 2022 Run Plans and Run Sheets

  • Run Plan Spread Sheet attachment:https://redmine.jlab.org/attachments/1456
  • JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf attachment:20211122_JLab_ExpSch.pdf
  • Beam pipe requirements attachment:beampipe_req.pdf
  • SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf

10.6 GeV Beam

  • Run Plan attachment:runplan_9p2gev.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
  • 10.6 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv
  • 10.6 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p173.ods attachment:runlist_pionLT_2021_Eb_9p173.pdf

10.6 GeV Run sheets

  • Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
  • Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
  • Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
  • Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
  • Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
  • Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf

8.5 GeV Beam

  • Run Plan attachment:runplan_9p9gev.pdf
  • Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
  • 8.5 GeV Run list attachment:runlist_pionLT_2021_Eb_9p876.csv
  • 8.5 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p876.ods attachment:runlist_pionLT_2021_Eb_9p876.pdf

8.5 GeV Run sheets

  • Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf
  • Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf
  • Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf
  • Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf
  • Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf

6.4 GeV Beam

  • Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf
  • Run Plan Part 2 (Jan/Feb) attachment:runplan_8p0gev-2.pdf
  • Scanned run plan (December) (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf
  • Scanned run plan (Jan/Feb) (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf
  • Special EDTM study w/ Cosmics attachment:Runplan_EDTM_21dec01.pdf
  • 6.4 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.csv
  • 6.4 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.csv
  • 6.4 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.ods attachment:runlist_pionLT_2021_Eb_7p937_Part1.pdf
  • 6.4 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.ods attachment:runlist_pionLT_2021_Eb_7p937_Part2.pdf

6.4 GeV Run sheets

  • Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf
  • Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf
  • Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf
  • Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf
  • Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf
  • Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf
  • Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf
  • Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf

Updated by Jacob Murphy over 2 years ago · 5 revisions